Loading...
HomeMy WebLinkAbout1975-Final (building)April I0, 1975 Faber Construction 2020 ~~hi to Swan Dr. Oshkosh, Wisconsin 54901 Attentions Robert Faber Dear Mr. Faber: On April 4, 1975: I made a final inspection at 1050 Maricopa Drive and noted the following violations 1. Occupancy prior tv an occupancy Permit being issued by the 3uilding inspector. 2. Masonry work not completed. 3rick veneer front oP house - chimney not completed. Permit for chimney sha11 be secured Prom the Building Inspector 3. Backfill around house not complete. 4. Garage floor not poured. 5. Bridging not nailed. 6. Framing around chimney through basement framing to close. 7. Trim work unfinished throughout house - doors not all set. $. Cleanout shall be provided for the furnace flues. 9. Frovide Qeans of access sa that an inspection can be made of roof framing. This work shall be completed and inspected by April 30, 1975• Please advise if there are any questions. sincerely, D:'~VID A. NITZ Assistant building Inspector DAN : db cc: Alfred Sedlachek