Loading...
HomeMy WebLinkAbout08-475DECEMBER 9, 2008 08 -475 RESOLUTION (CARRIED LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF CHANGE ORDER NO. 2 / PUBLIC WORKS CONTRACT 08 -06 / FISCHER -ULMAN CONSTRUCTION / CONCRETE SIDEWALK/ (- $26,618.31) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: Fischer -Ulman Construction 1115 S. Theodore St. Appleton, WI 54915 Net decrease to contract: ($26,618.31) PURPOSE: See attached Change Order. CHANGE ORDER # 2 DATED: November 24, 2008 TO: Fischer -Ulman Construction 1115 S. Theodore St. Appleton, WI 54915 Your present contract with the City of Oshkosh, Contract No. 08 -06 , is hereby amended and changed as follows: CONCRETE SIDEWALK (New and Reconstruction) ($26,618.31) NET DECREASE TO CONTRACT: ($26,618.31) CITY OF OSHKOSH Recommended: BY: City Manager Director of Public Works City Clerk roved and ac epted: Co ractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 08 -06 CHANGE ORDER # 2 CONCRETE SIDEWALK (New and Reconstruction) Page 1 INSTALLED N ET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT ITEM DESCRIPTION UNIT ECONTRACT QUANTITIES INCREASE DECREASE UNIT PRICE PRICE NUMBER 1 Sidewalk removal & driveway removal, com lete ass ecified Square Feet 95,725 104,187.74 8,462.74 $0.39 $3,300.47 $2,051.70 2 Concrete/asphalt sawing, Linear Feet 5,500 4,327.60 - 1,172.40 $1.75 complete ass ecified 3 Construct 4" thick concrete sidewalk in various locations in the City of Oshkosh, complete as Square Feet 93,600 97,194.90 3,594.90 $2,67 $9,598.38 s ecified 4 Construct 6" thick concrete sidewalk in various locations in the City of Oshkosh, complete as Square 19,100 20,695.96 1,595.96 $3.01 $4,803.84 s ecified Feet 5 Construct 7" thick crosswalk areas, complete Square 4,125 4,721.63 596.63 $ 318 $ 1 897,28 ass ecified Feet 6 Provide and install metal detectable warning plates, complete as specified Square Feet 264 288.00 24.00 $28.00 $672.00 7 Three (3 ") inch asphalt replacement, complete as Square 2,000 1,748.85 - 251.15 $3.50 $879.03 specified Feet 8 Curb and gutter removal, Linear 500 320.50 - 179.50 $3.00 $538:50) com lete ass specified Feet 9 Construct 30" curb and gutter, complete as Linear 500 369.70 - 130.30 $16.80 $2,189.04 s ecified Feet 10 Terrace restoration, including seed, fertilizer, and mulch, complete as Square 360 1,061.63 701.63 $3.50 $2,455.71 specified Yards 11 Furnish and install pavement ties, complete as 125 55.00 - 70.00. $7.00 $490.001 s ecified Each 12 Construct 4" thick concrete sidewalk in Water Dept. repair locations at approx. 60 sites, complete as specified Square Feet 3,500 2,142.99 - 1,357.01 $3.95 ($5,360.19 13 Construct 6" thick concrete sidewalk in Water Dept. repair locations at approx. 20 sites, complete as specified Square Feet 1,0001 1,947.44 947.44 $4.101 $3,884.50 Page 1 CONTRACT: 08 -06 CHANGE ORDER # 2 ADDITIONAL WORK REQUIRED: C.O. #2 INSTALLED NET NUMBER I DESCRIPTION I UNIT I CONTRACT UANTITIES I QUANTITIES I INCREASE I DECREASE .) CO UNIT ER 1A Reduction of change order #1, item #1, 8 "/7 -bag non- reinforced concrete Square Yard - 634.80 - 634.80 $43.75 INCREASE IN IDECREASEIN CONTRACT CONTRACT PRICE PRICE Page 2 INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT . CONTRACT ITEM DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE • UNIT PRICE PRICE NUMBER 14 7" non - reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified Square 100 52.55 -47.45 $38.00 $1,803.10 Yards 15 8" non - reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified Square Yards 1,500 233.19 - 1,266.81 $37.50 $47,505.38 16 8" special High Early Strength, non - reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb and grading, terracing and traffic control, complete as specified Square Yards 100 170.09 70.09 $45.00 $3,154.05 17 Factra crushed stone base, complete as specified Tons 200 279.67 79.67 $14.00 $1,115.38 18 No. 4 epoxy - coated reinforcement rods, Linear Feet 600 280.00 - 320.00 $1.50 ($480.00) installed ass ecified 19 Furnish, install, and maintain Type "C" inlet protection, complete as Each 20 8.00 - 12.00 $40.00 ($480.00) s ecified 20 Furnish, install, and maintain Type "D" inlet protection, complete as Each 5 0.00 -5.00 $40.00 $200.00) s ecified 21 Construct 12" wide radius curb head, complete as Linear Feet 1501 179.00 29.00 $3.001 $87.00 s ecified $30,968.61 ($61,976.94) SUB -TOTAL ADDITIONAL WORK REQUIRED: C.O. #2 INSTALLED NET NUMBER I DESCRIPTION I UNIT I CONTRACT UANTITIES I QUANTITIES I INCREASE I DECREASE .) CO UNIT ER 1A Reduction of change order #1, item #1, 8 "/7 -bag non- reinforced concrete Square Yard - 634.80 - 634.80 $43.75 INCREASE IN IDECREASEIN CONTRACT CONTRACT PRICE PRICE Page 2 CONTRACT: 08 -06 CHANGE ORDER # 2 $63,131.13 .($89,749.44) NET DECREASE TO CONTRACT: ($26,618.31) Page 3. UNIT CONTRACT QUANTITIES INSTALLED QUANTITIES NET. INCREASE NET DECREASE COST PER UNIT INCREASE IN CONTRACT PRICE , DECREASE IN CONTRACT PRICE ITEM DESCRIPTION NUMBER 1 8 -bag non - reinforced concrete removal & replace ment, including sawing, pavement ties, integral curb & grading, terracing. & traffic control, complete as Square 475.46 475.46 $43.75 $20,801.38 specified Yard 2 9 "/7 -bag non - reinforced concrete removal & replacement, including sawing, pavement ties, integral curb & gutter, terracing & traffic control, Square 195.25 195.25 $47.50 $9,274.38 complete asspecified Yard 3 Patch apron at 2034 Lump 1.00 1.00 $ 1 00.00 $100.00 Memominee Drive Sum 4 Construct 8" thick concrete Square 122.40 $3.65 $446.76 sidewalk Feet ..122.40 5 E -Mat on N. Main Street Square Yard 504.00 504.00 $2.50 $1,260.00 6 Fill in street patch at 932 Winnebago Ave. with Lump 1.00 1.00 $ 280.00 $280.00 ravel, Jump sum Sum ADDITIONAL WORK: C.O. # 2 - (ITEMS 1 - 6) - SUB TOTAL $32,162.52 ($27,772.50) $63,131.13 .($89,749.44) NET DECREASE TO CONTRACT: ($26,618.31) Page 3. ( 0 OfHKO H ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works DATE: December 4, 2008 RE: Change Order #2 for Public Works Contract No. 08 -06; Concrete Sidewalk (New and Reconstruction) BACKGROUND Change Order #2 for Contract 08 -06 is scheduled for consideration by the Common Council at the December 9, 2008 meeting. The contract was originally awarded to Fischer -Ulman Construction of Appleton in March 2008. This change order finalizes all quantities to the units actually installed. ANALYSIS All construction for this contract has been completed and final measurements taken. Any additional work items required to complete the project are included. The actual measured quantities are entered and the final result is a decrease to the contract. FISCAL IMPACT Funding for the project was in the 2008 Capital Improvement Budget. The contract has been decreased by $26,618.31. RECOMMENDATIONS I recommend approval of the Change Order #2 to Contact No. 08 -06 for a decrease of $26,618.31 to Fisher -Ulman Construction. Respectfully Submitted, A7' x'�J Steven M. Gohde Asst. Director of Public Works Approved: City Manager I:\Engineering \08 -06 Sidewalk Rehab\Project_ Information \Correspondence\Memo \CO #2 exp.doe