Loading...
HomeMy WebLinkAboutCertificate of Occupancy - 12/2/08CITY HALL Inspection Services Div 215 Church Avenue City of Oshkosh PO Box 1130 Oshkosh WI 54903-1130 OfHKOfH ON THE WATER Approved: 09/03/2008 Issued: 12/02/2008 Omni Paint & Glass Inc 3530 Omni Dr Oshkosh WI 54904 CERTIFICATE OF OCCUPANCY An Occupancy Permit is hereby issued for the Two Office/Shop Mezzanines located at 3530 Omni Dr, Oshkosh WI as described in Building Permit #126284. This building shall be used for storage and is located in the C-2 General Commercial Planned Development District. LIMITATIONS: Maximum number of persons: Per State Approved Plan Certificate of Occupancy shall be required prior to occupancy, should additional building(s) be erected, or should any buildings mentioned above be altered or moved. The use of land, or buildings, shall not be changed until a Certificate of Occupancy is issued for that occupancy. All conditions n~o .r~above must be complied with in order for this certificate to be vat / \ ulr~tor ot~inspection Se cc: Miron Construction Building Permit Work Card Job Address 3530 OMNI DR Permit Number 0126284 Create Date 8/14/2007__ Owner OMNI GLASS & PAINT INC Contractor OWNER Category 210 -Addition Industrial Plan W6-115-1206 Occupany Permit Required Flood Plain Height Permit _ Class of Const: Use/Nature ffice/Shop -Erect 2pre-engineered, pre-fabricated mezzanines. of Work HVAC Contr Plumbing Contr Electric Contr :e 9/25/2007 Type Final Inspector Allyn Dannhoff ,..., .._ -mail dated 9/25/07 ~~v~ T:~~ __~ ved °•~• ~ •^~° ~aMw°°~°4• Notice Type: Ready Date/Time: -- -- - --- Access: -- --- _-___ _ -- _ _ I Requested By: Phone Number: Reinspect Fee ~ Fee Waived ^ Reinspect Fee Paid ------------------------------------------------- ------------------- - --------------------------- --------------------- Date 9/3/2008 Type Final Inspector Allyn Dannhoff approved terns previously inspected on 11/15/07 are addressed or in the process of being addressed. Date/Time requested: Notice Type: Ready Date/Time: Access: Requested By: Phone Number: Reinspect Fee ~ Fee Waived ^ Reinspect Fee Paid Page 1 of 1 Dannhoff, Allyn J. From: Dannhoff, Allyn J. Sent: Tuesday, September 25, 2007 2:53 PM To: 'mneubauer@mironconst.com' Cc: Benner, Kevin; Wolf, Paul T.; Wood, Rich; Schrottky, Stu Subject: Omni Occupancy Mark; The inspection today revealed the following items to correct: Office/shop 1. Finalize an Emergency Illumination plan. I have sketched for my staff and Dave Buss what I believe to be the exit paths that need emergency illumination. Need consensus from the designer. 2. Install all Emergency Illumination per an accepted plan. 3. Install all exit lights as outlined on the plan sketched out for Dave Buss (top of stairs, directional exit lite on West pre- fab mezzanine, directional exit light for exit path that makes a turn under the west pre-fab mezzanine.) 4. Finish sprinkler protection of office P100. 5. Protect the mechanical equipment (SE corner of south wing) from vehicular impact (fork trucks.) 6. Provide Building Compliance Statement. Pre-Fab Mezzanines 1. Provide Guards/gates to meet all guardrail dimension requirements and loading requirements at the loading points 2. Provide Building Compliance Statement. Storage Building 1. Building is approved as aNon-combustible building. Remove the combustible wall or replace with non-combustible elements or submit a revision to the state reclassifying this building. 2. The partition wall was not part of the stamped approved plan. Revised plans shall be submitted as the partition wall affects exiting. The south room needs two exits. 3. All rooms with two exits shall be provided with emergency illumination. Submit an emergency illumination plan. 4. Provide exit lights. 5. Provide .Building Compliance Statement. General 1. Finish Dumpster Enclosure 2. Finish Parking lot striping, handicap stalls and signage. 3. Finish landscaping. 4. Remove Miron traitor at SE corner of lot. This trailer is not be used for any purpose and it is clear the intent is for advertising, which has not been permitted. Mark, as discussed you will communicate this to the Architect. Please note, by policy we allow the occupant to move in belongings and stock without an Occupancy Permit. However they cannot commence business activities until an Occupancy Permit is secured. If they desire to phase in occupancy, they may obtain a Temporary Occupancy Permit as long as approvals from all inspectors, including Fire Dept. are obtained. Fox example if they want to commence Office operations prior to everything being done, that might be approved as long as the office area is approved for occupancy. In this example, this office would require items 1 &2 for the main building to be completed to secure Building and HVAC approval of a Temp. Occupancy Permit. In general we look for the life safety items to be reasonably compliant before issuing T.O.P.'s. Attached is the TOP policy and application for your reference. Thanks. Allyn Dannhoff 920-236-5045 Temporary TOP Application.doc :cupancy ApprovatP commerce.wi.gov isconsin Department of Commerce Safety and Buildings 2331 SAN LUIS PL STE 150 GREEN BAY WI 54304 TDD #: (608) 264-8777 www.commerce.wi.gov/sb/ www.wisconsin.gov Jim Doyle, Governor Mary P. Burke, Secretary August 08, 2007 CUST ID No. 270589 THOMAS G OLSON MILLER WAGNER COENEN MCMAHON INC 1445 MCMAHON DR NEENAH WI 54956 A77'N: Buildings & Structures Building Inspector BUILDING INSPECTION CITY OF OSHKOSH POB 1130 OSHKOSH WI 54902 (Please forward a copy of this letter to the fore department conducting inspections of this project.) CONDITIONAL APPROVAL PLAN APPROVAL EXPIRES: 11/13/2008 SITE: Omni Glass & Paint 2010 Dickinson Ave City of Oshkosh, 54904 . FOR: Facility: 682189 OMNI GLASS & PAINT 2010 DICKINSON AVE OSHKOSH 54904 Identification Numbers Transaction ID No. 1415953 Site ID No. 195680 Please refer to both identification numbers, above, in all cones ondence with the a enc . EIVED AUG 10 2007 DEPARTMENT OF COMMUNITY DEVELOPMENT Tenant Name or Addn/A1t Description: Storage Mezzanine 1 Component INSPECTION SERVICES DIVISION Object Type: Building ICC Regulated Object ID No.: 1141529 Major Occupancy: Factory; Type IIB Metal Frame Unprotected class of construction; Component plan; 2,422 project sq ft; Occupancy: F-1 Factory Moderate-Hazard Tenant Name or Addn/Alt Description: Storage Mezzanine 2 Component Object Type: Building ICC Regulated Object ID No.: 1141530 Major Occupancy: Factory; Type IIB Metal Frame Unprotected class of construction; Component plan; 1,865 project sq ft; Occupancy: F-1 Factory Moderate-Hazard The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes and Wisconsin Statutes. The submittal has been.CONDITIONALLY APPROVED. The owner, as defined in chapter 101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements. The following conditions. shall be met during construction or installation and prior to occupancy or use: • IBC 2208.1 Provide a licensed structural welder (as issued by the WI Dept of Commerce) for areas of the building where structural welding will occur. The name of the worker and proof of licensure shall be made available to the Dept. representative upon request. A copy of the approved plans, specifications and this letter shall be on-site during construction and open to inspection by authorized representatives. of the Department, which may include local inspectors. If plan index sheets were submitted in lieu of additional full plansets, a copy of this approval letter and index sheet shall be attached to plans that correspond with the copy on file with the Department. All permits required by the state or the local municipality shall be obtained prior to commencement of cons[ruction/installation/operation. If this construction project will disturb one or more acres of land, an Erosion Control Notice of Intent (NOI) shall be filed with the department 7 days prior to any eazth disturbing activities. You will need to either file the NOI and an THOMAS G OLSON Page 2 8!8/2007 erosion control plan summary on-line at www.commerce.wi.gov/sb or submit a completed NOI form and either a plan summary or complete plan to us, with additional fees, or to the certified municipality. In granting this approval the Division of Safety & Buildings reserves the right to require changes or additions should conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this review shall relieve the designer of the responsibility for designing a safe building, structure, or component. Inquiries concerning this correspondence may be made to me at the telephone number listed below, or at the address on 's letterhead. S cer ly, Fee Required $ 100.00 Fee Received $ 100.00 Balance Due $ 0.00 onald L Diedrick Plan Reviewer ,Integrated Services WiSMART code`.7648 (920)492-5606 , M-TH 6:3G am - 4:00 pm, Fri a.m. Only don.diedrick @wisconsin.gov cc: Brian W Ferris, Section Chief /Field Operations, (608) 785-9335 ,Monday, 8 am - 5 pm David Miller, Omni Glass & Paint Proposed Rules: The Wisconsin Division of Safety & Buildings is in the process of adopting the 2006 International Code Council suite of building codes, including the International Existing Buildings Code, with a likely effective date in the second half of 2007. You may view or download the proposed chs. Comm 61-65 hearing draft at www.commerce.wi.gov/SB/SB-CodeDevelonment html New Rules: Effective April 1, 2007, the Division of Safety & Buildings will be implementing new erosion control and stormwater rules in ch. Comm 60 for projects begun on or after that date. You may view or download the rules at www.commerce.wi.gov/SB/SB-CodeDevelopment html Included in the rules will be expanded erosion controt coverage for all commercial construction sites regardless of size. Required erosion control submittal information to us may be done with a planned on-line webtool.