Loading...
HomeMy WebLinkAbout0134106-Plumbing (laterals)CITY OF OSHKOSH No 134106 OSHKOSH ON THE WATER Job Address 1280 MARICOPA DR Contractor EARTH WORKS LLC PLUMBING PERMIT -APPLICATION AND RECORD Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Owner WILLIAM/JANELLE BRADY Create Date 11/19/2008 Category 401 -Residential-Exterior (laterals) Plan Wait. St. Shamp Sink Coffee Maker Ice Chest Flr/V1Ist Sink Int Grease Trap Exam Sink Catch Basin Ext Grease Trap Sculry Sink Wash Ftn RPZ Valve Hand Sink Urinal Eye Wash Statn Plaster Sink Standp Rec Wtr Sewer Mtrs Surgeons Sink Ice Maker Deduct Meters F Prep Sink Gar Drain Wtr Usage Mtrs Serv Sink Soda Disp n sewer in combination with neighbor at 1270 Maricopa for sump pump discharge. Owners will agreement filed with the Registrar of Deeds for Winnebago County as a condition of this permit. Size Material Type Sanitary Sewer Storm Sewer 4" Plastic Lateral Water Service # Conn. Type 1 New to obtain common Parcel Id # 1313070000 Valuation Issued By $500.00 Plan Approval $0.00 permit Fees $50.00 ^ Permit Voided Date 11/19/2008 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in pe it applipti thin a e t, the City strongly urges the permit applicant to contact the easement hol ) nd to se re any n provals before starting such activity. /~ Signature Date ~~ ~~''~p Agent/Owner Address N4295 OAK LANE KAUKAUNA WI 54130 - 0000 Telephone Number 920-788-1528 ~~ a~~~~~~~~ u~apeciivns pease can ine mspection Kequest line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.