July 15, 198 2
Yarbro-Kempinger Architects,Inc.
1018 W. South Park Ave.
Oshkosh, WI 54901
Gentlemen:
RE: Plumbing Plan Approval for
Alterations to Wharf Bar, 663 N. Main St.
Oshkosh, Plan ID ~~:L6-782
Examination of the plumbing plans and specifications for the abovementioned
project has been completed.
In accord with Chapter 145, Wisconsin Statutes, and Chapter H62, Wisconsin
Administrative Code, the plumbing plans and specifications are approved
contingent upon compliance with the stipulation noted below:
1) Plumbing Plan is in reasonable compliance with state and local
plumbing regulations.
The architect, professional engineer, registered designer, owner or plumbing
contractor shall keep, at the construction site, one set of plans bearing the
stamp of approval.
In the event installation of this plumbing system has not commenced within
two years from this date, this approval shall become void. Anew application
accompanied by full examination fee shall be filed and an updated approval
received before work may commence.
In granting this approval, the City of Oshkosh or its representative does not
hold itself liable for any defects in plans or specification, plan omissions,
examination oversight, construction or any damage that may result in or after
installation and reserves the right to order changes or additions should
conditions arise making this necessary.
It shall be necessary for installing plumber to obtain a plumbing permit from
the City of Oshkosh before proceeding with actual installation of this plumbing
system or any of its parts.
Sincerely ,
r'' /~~
MARVIN HI GLEY
Plumbing Supervisor
MH:mr
P. O. BOX 1130 • OSHKOSH, WISCONSIN 54902
~`':
,,~
~a ~.
~~~
July. 12, 1982
Yarbro-Kempinger Architects
1018 W. South Park Avenue
Oshkosh, WI 54901
Re: Plumbing Plan Approval for
remodel of 6fi3 N. Main
Dear Dick:
The plan submitted isn't complete enough for me to
examine for approval. "Verify in Field", is a little
vague for a plan approval. Bar areas have plumbing
that needs to be on plan. Water calculations also
need to be included. Resubmit for approval and
include above.
Yours truly,
MARVIN HIGLEY
Plumbing Supervisor
MH:njp