Loading...
HomeMy WebLinkAbout0134070-BuildingCITY OF OSHKOSH No 134070 OSHKOSH ON THE WATER Job Address 1580 ARBORETUM DR BUILDING PERMIT -APPLICATION AND RECORD Owner MARY C KREZ REV TRUST Designer Category 140 -Interior Remodelin Create Date 11/18/2008 Plan Type ~ Building Q Sign Q Canopy Q Fence Q Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. ^ Projection Finished/Living Sq. Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation ~ Poured Concrete Q Floating Slab Q Pier Q Other Q Concrete Block Q Post Q Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature of Work FR/ Bathroom remodel* to include gutting, relocating fixtures and finishing. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $15,000.00 Plan Approval $0.00 Permit Fee Paid _ Issued By: _~"~ ^ Permit Voided Parcel Id # 1224410000 In the pertormance of this work 1 agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starling such activity. have read and unded the afore . e/ntione~d/ipformation. j Signature ~ ~ '.^,.y.a.;~~L~'~ dZ=~-~,,~ Date ~ L~~ "'7~ Agent/Owner Address 2883 RUSCHFIELD DR OSHKOSH WI 54904 - 7404 Telephone Number 420-5005 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. Contractor LEACH BROS. $118.00 Park Dedication $0.00 Date 11/18/2008 Final/O.P.00/00/0000