HomeMy WebLinkAbout0134090-Building (fixture room)
OSHKOSH
ON THE WATER
Job Address 2830 ATLAS AVE
Designer
Category 211 -Alteration Industrial
Plan
Type ~ Building Q Sign Q Canopy Q Fence Q Raze
Zoning Class of Const: 2b Size
Unfinished/Basement Sq. Ft. Rooms Height Ft. ^ Projection
Finished/Living Sq. Ft. Bedrooms Stories 1 Canopies
Garage Sq. Ft. Baths Signs
Foundation Q Poured Concrete Q Floating Slab Q Pier ~ Other
Q Concrete Block Q Post Q Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature
of Work
CITY OF OSHKOSH No 134090
BUILDING PERMIT -APPLICATION AND RECORD
Owner DOWLING INVESTMENTS ATLAS LLC Create Date 11/18/2008
Contractor DOWLING CONSTRUCTION INC
rehouse / Install a single fixture toilet room in SW comer of 2008 Addition. ' Owner to forward
number of employees to support the bathroom fixture count. Framing to be non-combustible.
regarding
HVAC Contractor
Electric Contractor
Fees: Valuatio
Issued By:
Plumbing Contractor
Plan Approval $0.00 Permit Fee Paid $39.00 Park Dedication $0.00
Date 11/18/2008 Final/O.P.00/00/0000
^ Permit Voided ~ Parcel Id # 1329200200
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
I have read and utand the mentioned information.
Signature Date ~ ~ ~~ ~ $ ~ b ~
Agent/Owner
Address PO BOX 3045 OSHKOSH WI 54903 - 3045 Teleohone Number 235-8021
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.