Loading...
HomeMy WebLinkAbout0134090-Building (fixture room) OSHKOSH ON THE WATER Job Address 2830 ATLAS AVE Designer Category 211 -Alteration Industrial Plan Type ~ Building Q Sign Q Canopy Q Fence Q Raze Zoning Class of Const: 2b Size Unfinished/Basement Sq. Ft. Rooms Height Ft. ^ Projection Finished/Living Sq. Ft. Bedrooms Stories 1 Canopies Garage Sq. Ft. Baths Signs Foundation Q Poured Concrete Q Floating Slab Q Pier ~ Other Q Concrete Block Q Post Q Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature of Work CITY OF OSHKOSH No 134090 BUILDING PERMIT -APPLICATION AND RECORD Owner DOWLING INVESTMENTS ATLAS LLC Create Date 11/18/2008 Contractor DOWLING CONSTRUCTION INC rehouse / Install a single fixture toilet room in SW comer of 2008 Addition. ' Owner to forward number of employees to support the bathroom fixture count. Framing to be non-combustible. regarding HVAC Contractor Electric Contractor Fees: Valuatio Issued By: Plumbing Contractor Plan Approval $0.00 Permit Fee Paid $39.00 Park Dedication $0.00 Date 11/18/2008 Final/O.P.00/00/0000 ^ Permit Voided ~ Parcel Id # 1329200200 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. I have read and utand the mentioned information. Signature Date ~ ~ ~~ ~ $ ~ b ~ Agent/Owner Address PO BOX 3045 OSHKOSH WI 54903 - 3045 Teleohone Number 235-8021 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.