Loading...
HomeMy WebLinkAbout2008-Plumbing (water heater)OSHKOSH ON THE WATER Job Address 722 WRIGHT ST CITY OF OSHKOSH PLUMBING PERMIT-.APPLICATION AND RECORD Owner EVAN C PONZER Contractor SAMMONS PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain "~ Roof Drain Misc. Fixtures Use/Nature. of Work Shower Floor Drain Lndry Tray _ Disposal Dishwasher Sump Pump _1 Classrm Sink Breakrm Sink Ejector/Grind Category 4.11 -Residential-Water Heaters Water Softner Wait. St. Shamp Sink Local Waste Ice Chest FINYVst Sink Clothes Wshr Exam Sink Catch Basin Bidet Sculry Sink :Wash Ftn _ Beer Tap Hand Sink Urinal Lab Sink- Plaster Sink' ~ ~ Standp Rec Sterilizer -: Surgeons Sink- - Ice+Maker Dip Well F Prep Sink .€ ' .Gat Drain Drink Ftn - Serv Sink ,~ - ° SodaDisp ~. -„ No 134058 Create Date 11/17/2008 Plan _ Coffee Maker Int Grease Trap Ext Grease Trap _ RPZ Valve Eye Wash Statn _ Wtr Sewer Mtrs Deduct Meters - Wtr Usage Mtrs Valuation $700.00 Plan Approval $0.00 permit Fees $25.00 ^ Permit Voided Issued By _ Date 11/17/2008 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.