HomeMy WebLinkAbout0134052-Plumbing (sink & disposal)CITY OF OSHKOSH No 734os2
OSHKOSH
ON THE WATER
Job Address 548 W SMITH AVE
Contractor SAMMONS PLUMBING
PLUMBING PERMIT r APPLICATION:AND RECORD
Bathtub Shower
Whirlpool Floor Drain
Lavatory Lndry Tray
Toilet Disposal
Res. Sink 1 Dishwasher
Bar Sink Sump Pump
Water Heater Classrm Sink
Site Drain ~ Breakrm Sink
Roof Drain Ejector/Grind
Misc.
Fixtures
Use/Nature
of Work
Water Softne
_ Local Waste
Clothes Wshr
1 Bidet
_ Beer Tap
_ Lab Sink
_ Sterilizer
_ Dip Well
Drink Ftn
Owner.. ROBERT J CORNELL Create Date 11/17/2008
Category 410 -Residential-Interior Plan
Wait. St. Shamp Sink .Coffee Maker
Ice Chest FIrIWst Sink Int Grease Trap
Exam Sink Catch Basin Ext Grease Trap
Scuiry Sink Wash Ftn RPZ Valve
Hand Sink Urinal Eye Wash Statn
Plaster Sink Standp Rec Wtr:Sewec Mtrs
Surgeons Sink Ice Maker ; =Deduct Meters ,
,, F:Prep Sink Gar Drain = -Wtr•Usage Mtrs ,
. °...Serv Sink Soda Disp r
.
Valuation $1,300.00 Plan Approval $0.00 Permit Fees $25.00 ^ Permit Voided
Issued By _ ~J Date 11/17/2008
In the performance of this work, I agree to pertorm all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522 W. MURDOCK AVE OSHKOSH
WI 54901 - 2298 Telephone Number 231-9880
.........~.....~ .naNva.uvna Nwases van zne mspeGZlon KequeSt Iln@ at 236-572$ noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.