Loading...
HomeMy WebLinkAbout0134052-Plumbing (sink & disposal)CITY OF OSHKOSH No 734os2 OSHKOSH ON THE WATER Job Address 548 W SMITH AVE Contractor SAMMONS PLUMBING PLUMBING PERMIT r APPLICATION:AND RECORD Bathtub Shower Whirlpool Floor Drain Lavatory Lndry Tray Toilet Disposal Res. Sink 1 Dishwasher Bar Sink Sump Pump Water Heater Classrm Sink Site Drain ~ Breakrm Sink Roof Drain Ejector/Grind Misc. Fixtures Use/Nature of Work Water Softne _ Local Waste Clothes Wshr 1 Bidet _ Beer Tap _ Lab Sink _ Sterilizer _ Dip Well Drink Ftn Owner.. ROBERT J CORNELL Create Date 11/17/2008 Category 410 -Residential-Interior Plan Wait. St. Shamp Sink .Coffee Maker Ice Chest FIrIWst Sink Int Grease Trap Exam Sink Catch Basin Ext Grease Trap Scuiry Sink Wash Ftn RPZ Valve Hand Sink Urinal Eye Wash Statn Plaster Sink Standp Rec Wtr:Sewec Mtrs Surgeons Sink Ice Maker ; =Deduct Meters , ,, F:Prep Sink Gar Drain = -Wtr•Usage Mtrs , . °...Serv Sink Soda Disp r . Valuation $1,300.00 Plan Approval $0.00 Permit Fees $25.00 ^ Permit Voided Issued By _ ~J Date 11/17/2008 In the performance of this work, I agree to pertorm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 .........~.....~ .naNva.uvna Nwases van zne mspeGZlon KequeSt Iln@ at 236-572$ noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.