Loading...
HomeMy WebLinkAbout0134053-Plumbing (disposal)I~I'~ CITY OF OSHKOSH OSHKOSH PLUMBING PERMIT -APPLICATION-.AND RECORD ON THE WATER Job Address 2206 MEADOWBROOK CT #B Contractor SAMMONS PLUMBING Bathtub Shower Whirlpool Floor Drain Lavatory Lndry Tray Toilet Disposal Res. Sink Dishwasher Bar Sink ` ... Sump Pump Water Heater ' ~ Classrm Sink Site Drain - Breakrm Sink Roof Drain Ejector/Grind Misc. Fixtures Use/Nature of Work Owner RUTH A VORPAHL Category 410.- Residential-Interior Water Softner _ Local Waste Clothes Wshr 1 Bidet _ Beer Tap Lab Sink Sterilizer , Dip Weil Drink Ftn Wait St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink: Surgeons Sink F Prep Sink Serv Sink . Valuation $300.00 Plan Approval $0.00 Permit Fees Issued By Tim Shamp Sink _ _ Flr/V1Ist Sink _ Catch Basin _ Wash Ftn Urinal Standp Rec. Ice Maker Gar Drain Soda: Disp - is ..,r•s No 134053 Create Date 11/17/2008 Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve fye Wash Statn Wtr,Sewer Mtrs -Deduct Meters Wtr Usage Mtrs I $25.00 ^ Permit Voided In the pertormance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you pertorm the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Date 11/17/2008 AgenUOwner Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not pertormed within two business days from the time the project is ready.