HomeMy WebLinkAbout0134053-Plumbing (disposal)I~I'~ CITY OF OSHKOSH
OSHKOSH PLUMBING PERMIT -APPLICATION-.AND RECORD
ON THE WATER
Job Address 2206 MEADOWBROOK CT #B
Contractor SAMMONS PLUMBING
Bathtub Shower
Whirlpool Floor Drain
Lavatory Lndry Tray
Toilet Disposal
Res. Sink Dishwasher
Bar Sink ` ... Sump Pump
Water Heater ' ~ Classrm Sink
Site Drain - Breakrm Sink
Roof Drain Ejector/Grind
Misc.
Fixtures
Use/Nature
of Work
Owner RUTH A VORPAHL
Category 410.- Residential-Interior
Water Softner
_ Local Waste
Clothes Wshr
1 Bidet
_ Beer Tap
Lab Sink
Sterilizer ,
Dip Weil
Drink Ftn
Wait St.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink:
Surgeons Sink
F Prep Sink
Serv Sink .
Valuation $300.00 Plan Approval $0.00 Permit Fees
Issued By Tim
Shamp Sink _
_ Flr/V1Ist Sink
_ Catch Basin _
Wash Ftn
Urinal
Standp Rec.
Ice Maker
Gar Drain
Soda: Disp -
is ..,r•s
No 134053
Create Date 11/17/2008
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
fye Wash Statn
Wtr,Sewer Mtrs
-Deduct Meters
Wtr Usage Mtrs
I
$25.00 ^ Permit Voided
In the pertormance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you pertorm the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Date 11/17/2008
AgenUOwner
Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not pertormed within two business days from the time the project is ready.