Loading...
HomeMy WebLinkAbout0134048-Plumbing (water heater)LJ OSHKOSH ON THE WATER Job Address 1924 KNAPP ST Contractor SAMMONS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD Bathtub Shower Whirlpool Floor Drain Lavatory Lndry Tray Toilet Disposal Res. Sink Dishwasher Bar Sink Sump Pump Water Heater. ~'1 Classrm Sink Site Drain ~ . , BreBkrm Sink Roof Drain Ejector/Grind Misc. Fixtures Use/Nature of Work Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Weil .. Drink Ftn Owner ROGER D QUAM Category 411 -Residential-Water Heaters No 134048 Create Date 11/17/2008 Plan Wait. St. Ice Chest Exam Sink Scuiry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs ;.Deduct Meters Wtr.Usage-Mfrs. Shamp Sink _ Flr/Vllst Sink _ Catch Basin Wash Ftn Urinal Standp Rec ,~ Maker Gar Drain Soda Disp Valuation $700.00 Plan Approval $0.00 Permit Fees $25.00 ^ Permit Voided Issued By Date 11/17/2008 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522 W. MURDOCK AVE OSHKOSH T. ~~L~J._~_ e WI 54901 - 2298 Telephone Number 231-9880 • -- ....••~....~o ~••ara...~~~~~ ~nvaaes van use mspeci~on reequest une at "136-5728 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.