HomeMy WebLinkAbout0134043-Plumbing (water heater)OSHKOSH
ON THE WATER
Job Address 1601 DOEMEL ST
CITY OF OSHKOSH
PLUMBING PERMIT -APPLICATION•AND RECORD
No 134043
Owner MICHAEL P/SUSAN SWEET- Create Date 11/17/2008
Category 411 -Residential-Water Heaters Plan
Contractor SAMMONS PLUMBING
Bathtub _
Whirlpool _
Lavatory _
Toilet _
Res. Sink _
Bar Sink _
Water-Heater
Site Drain ~ '
Roof Drain _
Misc.
Fixtures
Use/Nature
of Work
_ Shower Water Softner Wait. St. Shamp Sink Coffee Maker
Floor Drain Local Waste Ice Chest Fir/V1Ist Sink Int Grease Trap
_ Lndry Tray Clothes Wshr Exam Sink ...Catch Basin Ext Grease Trap
_ Disposal Bidet Sculry Sink Wash Ftn RPZ Valve
Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn
_ Sump Pump Lab Sink "Plaster Sink ; _ , Standp Rec Wtr Sewer Mtrs
1 Ciassrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters
_ Breakrm Sink Dip Well F Prep Sink ~ •. Gar;Drain. Wtr Usage Mtrs
Ejector/Grind Drink Ftn Serv-.Sink •Soda,Disp
...~c.
Valuation $700.00 Plan Approval $0.00 Permit Fees $25.00 ^ Permit Voided
issued By >(~ Date 11/17/2008
In the performance of this work, I agree to perform all work pursuant to rules governing the" described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522 W. MURDOCK AVE OSHKOSH
WI 54901 - 2298 Telephone Number 231-9880
~ o scneawe mspecnons please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.