HomeMy WebLinkAbout0134056-Plumbing (water heater)OSHKOSH
ON THE WATER
•. Job Address 1129 W 5TH AVE
Contractor SAMMONS PLUMBING
CITY OF OSHKOSH
No 134056
PLUMBING PERMIT -APPLICATION-.AND RECORD
Owner THEODORE L TRINOSKEY, ETAL Create Date 11/17!2008
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
•. ~ ,Site Drain
- - °ROOf Drain
Misc.
Fixtures
Use/Nature
of Work
Category 411 -Residential-Water Heaters Plan
Shower Water Softner Wait. St. Shamp Sink Coffee Maker
Floor Drain Local Waste Ice Chest FIr/V11st Sink Int Grease Trap
_ Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
Disposal Bidet Sculry Sink ~ Wash Ftn RPZ Valve
Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn
_ Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
1 Classrm Sink Sterilizer Surgeons Sink r - .:.Ice JNaker Deduct Meters ~ ,
Breakrm Sink Dip Well - f Prep Sink ~ ,Gar Drain Wtr Usage Mtrs
Ejector/Grind Drink Ftn Serv Sink ' ;-.Soda Disp
~ :. .
Valuation $700.0(~~~~~Approval $0.00 Permit Fees $25.00 ^ Permit Voided
Issued By
Date 11/17/2008
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starling such activity.
Signature Date
Agent/Owner
Address 522 W. MURDOCK AVE OSHKOSH
WI 54901 - 2298 Telephone Number 231-9880
~ o scneau~e mspeci~ons please call the inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.