Loading...
HomeMy WebLinkAbout0133891-Plumbing (abandon) OSHKOSH ON THE WATER Job Address 1856 OMRO RD Contractor M P KELLY Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work CITY OF OSHKOSH No 133891 PLUMBING PERMIT -APPLICATION AND RECORD Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink EjectorlGrind Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Owner KIELISCH PROPERTIES I LLC Create Date 11/07/2008 Category 401 - Residential-Exterior (laterals) Plan Wait. St. Shamp Sink Coffee Maker Ice Chest FIrIVVst Sink Int Grease Trap _ _ _ Exam Sink Catch Basin __ Ext Grease Trap Sculry Sink Wash Ftn _ _ RPZ Valve Hand Sink __ __ Urinal _ Eye Wash Statn Plaster Sink _ Standp Rec _ _ Wtr Sewer Mtrs Surgeons Sink Ice Maker - -- Deduct Meters __ F Prep Sink Gar Drain Wtr Usage Mtrs Serv Sink Soda Disp Valuation $100.00 Plan Approval $0.00 Permit Fees $25.00 ^ Permit Voided Issued By Date 11/07/2008 In the performance of this work, I agree to pertorm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST AgenUOwner OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 ~~~~CU~~~ ~nspectwns please can the inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.