Loading...
HomeMy WebLinkAbout0133916-Plumbing (laterals)CITY OF OSHKOSH No 133916 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 3504 W 20TH AVE Owner 20TH ST PARTNERSHIP LLC Create Date 10/21/2008 Contractor FREDERICKSON, GENE TRUCKING & EXCAVATI Category 430 -Industrial-Exterior (laterals) Pian F6-334-1108-P Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink _ Shamp Sink _ FlrlVllst Sink Catch Basin Wash Ftn Urinal Standp Rec _ Ice Maker Gar Drain Soda Disp Valuation $11,500.00 Plan Approval $0.00 Permit Fees $100.00 ^ Permit Voided Issued By Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Date 11/10/2008 In the pertomtance of this work, I agree to pertomt all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure a~cessary approvals before starting such activity. Signature Date ~ // Q Agent/Owner Address W1732 CTY RD KK KAUKAUNA Wt 54130 - 0000 Telephone Number 920-766-1100 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.