Loading...
HomeMy WebLinkAbout0133871-Plumbing (kitchen fixtures)OSHKOSH ON THE WATER Job Address 1513 CENTRAL ST Contractor SAMMONS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD Owner ROBERT C BUTT Category 410 -Residential-Interior No 133871 Create Date 11/06!2008 Plan Bathtub Shower Water Softner Wait. St. Shamp Sink Coffee Maker Whirlpool Floor Drain Local Waste Ice Chest Flr/Wst Sink Int Grease Trap Lavatory _ Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Toilet Disposal 1 Bidet Sculry Sink _ Wash Ftn RPZ Valve Res. Sink 1 Dishwasher 1 Beer Tap Hand Sink Urinal Eye Wash Statn Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Water Heater _ Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature FR /INSTALL-KITCHEN SINK, DISPOSAL & DISHWASHER "'debt acct of Work Size Material Type # Conn. Tvoe Sanitary Sewer Storm Sewer Water Service Parcel Id # 1501460000 Valuation $500.00 Plan Approval $0.00 Permit Fees $25.00 ^ Permit Voided Q - - .- - -- Issued By Date 11/06/2008 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starling such activity. Signature Date Agent/Owner Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 • ~ -~~••a••M~a ~~~~~~.w~~s pease can ine mspection Kequest line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.