Loading...
HomeMy WebLinkAbout0133777-Building~ 1 OSHKOSH ON THE WATER Job Address 1528 BOWEN ST Designer No 133777 Create Date 11/03/2008 Category 140 -Interior Remodeling Plan Type ~ Building Q Sign Q Canopy Q Fence Q Raze Zoning Class of Const: ~ Size Unfinished/Basement Sq. Ft. Finished/Living Sq. Ft. Garage Sq. Ft. Foundation ~ Poured Concrete Q Floating Slab Q Concrete Block Q Post Owner MARILYN C LIVINGSTON Contractor READY BUILDERS INC Rooms Height Bedrooms Stories Baths Q Pier Q Other Q Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Park Dedication # Dwelling Units 0 Use/Nature of Work CITY OF OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD Ft. .Height Permit # Structures Projection Canopies Signs 0 1 Remodeling the 1st floor bathroom. Gutting the room, installing a soffit area and new drywall. Anew vented through the roof. Installing new fixtures. t fan will be installed HVAC Contractor Plumbing Contractor J RASMUSSEN PLUMBING INC Electric Contractor COMINGS ELECTRIC INC Fees: Valuation $4,500.00 Plan Approval $0.00 Permit Fee Paid $53.00 Park Dedication $0.00 Issued By: ~~ Date 11/03!2008 Final/O.P. 00/00/0000 Permit Voided ~ Parcel Id # 1511840000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit app!' within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure scary provals before starting such activity. I have read and un e r entioP~information. Signature ,/~ Date ~ ~ ~~ Address E2734 HOBSON Agent/Owner WAUPACA WI 54981 -9426 Telephone Number 715-258-5688, home To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Finai, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not pertormed within two business days from the time the project is ready.