Loading...
HomeMy WebLinkAboutFinal (BLDG & HVAC) - 5/31/2001City of Oshkosh JOB LOCATION: ~~~ Cjp ~ fl~~4 ~-J~{ 1 S Inspection Services Division 215 Church Avenue, PO Box 1130 CONTRACTOR' ~ ~-1N ~y Oshkosh, WI 54903-1130 Phone: (920) 236-5050 Fax (920) 236-5084 PROJECT TO BE INSPECTED:_ ~.~~~ BUILDING: Footin HVAC: R h ELECTRIC: PLUMBING: EROSION CONTROL: PROPERTY MAINT.: g Foundation oug Furnace Rough Service Rough Test On Tracking Silt Fence Setback Park. Unlicensed Veh Rough A/C Temp Perm UnderFloor Stone Access G b Insulation Re-ins Fireplace R i UG OH Sewer/Water Straw Bales ar age Dilapidated bld's, fences, p. Fi ~- e- nsp. Re-insp. L/ Re-insp. Re-insp. etc. nal Final t/ Final Final Final Ext Maint . . COMPLIANCE DATE: ACTION. TAKEN: ^ Not Approved/ Insp. Report left on site ^ Not Approved/ Insp. Report given to ^ Mailed/Faxed Inspection Services Division /`'~ CORRECTION NOTICE /FIELD INSPECTION REPORT /`'~ ~"~3~~0~ Date of Inspection ~ Phone that the violations at the above address have been corrected. VIOLATIONS MUST BE CORRECTED AND APPROVED WITHIN 30 DAYS UNLESS OTHERWISE NOTED. CALL FOR RE-INSPECTIONS PRIOR TO CONCEALMENT AND/OR OCCUPANCY. WHEN CORRECTIONS ARE COMPLETED THE OWNER/CONTRACTOR IS REQUIRED TO SIGN & DATE THIS NOTICE AND RETURN IT TO THE INSPECTION DIVISION WHEN REQUESTING A RE INSPECTION