HomeMy WebLinkAbout0133655-Electric (garage addition)CITY OF OSHKOSH No 133655
OSHKOSH ELECTRIC PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 2138 HICKORY LN Owner DENNIS/KIM M WEISBRICK Create Date 10/23/2008
Contractor HOMEOWNER Category 612 -Residential-Single Family Addition/R Plan
Service New Q Change Q Temp ~ N/A ~ Type Q Overhead Q Underground
Volts Circuits 3 Luminaires 6
Amps Switches 4 Receptacles 12
Appliances
Use/Nature of
Work
Fees: Val
Issued By:
FR/ Constructing a 12'x22' addition onto the existing 22'x24' detached garage. Total garage space 792 sq.ft.
$700.00 Plan Approval $0.00 Permit Fee Paid $39.00
Permit Voided
Date 10/23/2008
Parcelld # 1518672400
The undersigned, in applying for an Electric Permit to perform electrical work within a single family home, owned and occupied
as the principle residence by the undersigned, hereby acknowledges per City Municipal Code Section 11-22, that other
individuals may not be employed to assist with the work described in this permit unless said individuals are licensed by the
City of Oshkosh to pertomt said work.
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this pe ft application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to s c e any necessary app vals bef a sta g such activity.
Signature c Date ~y ^~'~ '~
Address
AgenUOwner
OSHKOSH WI 5490 - 2516 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.