HomeMy WebLinkAbout0133086-Building (parking lot)CITY OF OSHKOSH No 133086
OSHKOSH
ON THE WATER
Job Address 2415 WESTOWNE AVE
Designer
Category 256 -Parking Lots, Driveways Plan
Type ~ Building ~ Sign Q Canopy ~ Fence Q Raze
Zoning Class of Const: Size
Unfinished/Basement Sq. Ft. Rooms Height Ft. ^ Projection
Finished/Living Sq. Ft. Bedrooms Stories Canopies
Garage Sq. Ft. Baths Signs
Foundation ~ Poured Concrete 0 Floating Slab ~ ,Pier O Other
Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
Use/Nature
of Work
BUILDING PERMIT -APPLICATION AND RECORD
Owner OSHKOSH GROCERS LLC Create Date 09/24/2008
Contractor NORTHCENTRAL CONSTRUCTION CORP.
Replace section of asphalt paving with concrete. All grades and drainage pattern to remain the same.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plan Approval
Plumbing Contractor
$0.00 Permit Fee Paid
$166.00 Park Dedication $0.00
Date 09/24/2008 Final/O.P.00/00/0000
^ Permit Voided Parcel Id # 1621650200
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the Ciry of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals befor farting such activity.
I have read and ers a afore me ormation. ~/
Signature Date 9^Z'~ ~1f
Agent/Owner
Address 63 S ICKORY ST FOND DU LAC WI 54935 - 0000 Telephone Number 920-929-9400
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.