Loading...
HomeMy WebLinkAbout0133086-Building (parking lot)CITY OF OSHKOSH No 133086 OSHKOSH ON THE WATER Job Address 2415 WESTOWNE AVE Designer Category 256 -Parking Lots, Driveways Plan Type ~ Building ~ Sign Q Canopy ~ Fence Q Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. ^ Projection Finished/Living Sq. Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation ~ Poured Concrete 0 Floating Slab ~ ,Pier O Other Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use/Nature of Work BUILDING PERMIT -APPLICATION AND RECORD Owner OSHKOSH GROCERS LLC Create Date 09/24/2008 Contractor NORTHCENTRAL CONSTRUCTION CORP. Replace section of asphalt paving with concrete. All grades and drainage pattern to remain the same. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plan Approval Plumbing Contractor $0.00 Permit Fee Paid $166.00 Park Dedication $0.00 Date 09/24/2008 Final/O.P.00/00/0000 ^ Permit Voided Parcel Id # 1621650200 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the Ciry of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals befor farting such activity. I have read and ers a afore me ormation. ~/ Signature Date 9^Z'~ ~1f Agent/Owner Address 63 S ICKORY ST FOND DU LAC WI 54935 - 0000 Telephone Number 920-929-9400 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.