HomeMy WebLinkAbout2008-Building (service doors)~1
OSHKOSH
ON THE WATER
Job Address 639 WITZEL AVE
Designer
Category 140 -Interior Remodeling Plan
Type ~ Building ~ Sign Q Canopy ~ Fence ~ Raze
Zoning Class of Const: Size
Unfinished/Basement Sq. Ft. Rooms Height Ft. ^ Projection
Finished/Living Sq. Ft. Bedrooms Stories Canopies
Garage Sq. Ft. Baths Signs
Foundation ~ Poured Concrete ~ Floating Slab ~ Pier ~ Other
.Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain No
Park Dedication Not Required # Dwelling Units 0
Use/Nature
of Work
CITY OF OSHKOSH
BUILDING PERMIT -APPLICATION AND RECORD
Height Permit Not Required
# Structures 0
ITY /Remove and replace 2 existing service doors and frames one on East and one on the North side of building. - NO STRUCTURAL
RANGES
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $5,100.00 Plan Approval $0.00 Permit Fee Paid $0.00 Park Dedication $0.00
Issued By: Date 09/23/2008 Final/O.P. 00/00/0000
^ Permit Voided Parcel Id # 0603510100
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
I have read and understand the afore mentioned information.
Signature Date
Address 203 OTTER AVE
Owner CITY OF OSHKOSH CITY GARAGE
No 133054
Create Date 09/23!2008
Contractor FLUOR BROS CONSTRUCTION CO
AgenUOwner
OSHKOSH
WI 54901 - 0000 Telephone Number 231-6260
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.