Loading...
HomeMy WebLinkAbout2008-Building (service doors)~1 OSHKOSH ON THE WATER Job Address 639 WITZEL AVE Designer Category 140 -Interior Remodeling Plan Type ~ Building ~ Sign Q Canopy ~ Fence ~ Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. ^ Projection Finished/Living Sq. Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation ~ Poured Concrete ~ Floating Slab ~ Pier ~ Other .Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain No Park Dedication Not Required # Dwelling Units 0 Use/Nature of Work CITY OF OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD Height Permit Not Required # Structures 0 ITY /Remove and replace 2 existing service doors and frames one on East and one on the North side of building. - NO STRUCTURAL RANGES HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5,100.00 Plan Approval $0.00 Permit Fee Paid $0.00 Park Dedication $0.00 Issued By: Date 09/23/2008 Final/O.P. 00/00/0000 ^ Permit Voided Parcel Id # 0603510100 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. I have read and understand the afore mentioned information. Signature Date Address 203 OTTER AVE Owner CITY OF OSHKOSH CITY GARAGE No 133054 Create Date 09/23!2008 Contractor FLUOR BROS CONSTRUCTION CO AgenUOwner OSHKOSH WI 54901 - 0000 Telephone Number 231-6260 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.