Loading...
HomeMy WebLinkAbout0133031-Building (exterior walls)CITY OF OSHKOSH No 133031 OSHKOSH ON THE WATER Job Address 1036 W 5TH AVE Designer Category 141 -Exterior Remodeling Plan Type ~ Building [~ Sign 0 Canopy ~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. ^ Projection Finished/Living Sq. Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation ~ Poured Concrete ~ Floating Slab ~ Pier ~ Other Concrete Block ~ Post ~ Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature of Work BUILDING PERMIT -APPLICATION AND RECORD Owner CORY M SCHULTZ Contractor GEFFERS REMODELING Create Date 09/22/2008 at the rear/ side HVAC Contractor Electric Contractor Fees: Valuation $2,000.00 Plan Approval Issued By: ~~~ Plumbing Contractor $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Date 09/22/2008 Final/O.P.00/00/0000 ^ Permit Voided Parcel Id # 0606690000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secu any necessary approvals before starting such activity. ~/ I have read and and s d th aforg. mentioned information. Signature C/~,V, Date ~~ Q Agent/Owner Address 208 E SNELL RD OSHKOSH WI 54901 - 0000 Telephone Number 235-1422 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.