HomeMy WebLinkAbout08-347SEPTEMBER 26, 2008 08 -347 RESOLUTION (CARRIED LOST LAID OVER WITHDRAWN ) PURPOSE: CHANGE ORDER NO. 1, PUBLIC WORKS CONTRACT NO. 08 -05 FOR WATER FILTRATION PLANT WITH CH2M HILL ($159,184.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: CH2M HILL 135 S. 84th Street Milwaukee, WI 53214 Net Increase to contract: $159,184.00 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 541-1810-1799-00000 — Water Utility Construction Work in Progress P ERMANENT . . ZONING - MIDWEST VOLUNTARY. ATTACIII4ENT PROPOSED LOT 1 - R -3 Multiple Dwelling PROPOSED LOT 2 - R -3 PD Multiple Dwelling with a Planned Devel �i rl>< 7 D .5`U1S 1�3r i...._...._ --- BEING ALL OF LOT 1 OF CMTIFI D 1/4 1�� THE SO / � � 11 OF PAGE 6070. LOCATED IN T NORTHWEST NORM, RANGE / EAST. CITY OF OSFICOSH. WINNE = COUMY, SECTION 32. TOWNSHIP NORTH LINE OF THE NORTHEAST NORTH 1/4 CORNER 1 4 OF SECTION 32 -18-16 SECAON 32 -18-16 ��, (��r. m vim WVX0 LANDS mmmmim . O m z =F. i LOT 1 CSM�4446 mA, �1 l i d RESOURCES CUNS ULIM. uw.. ac FlELD LOCATION (TYPICAL) SECTION 32 - 18 - 15 ff. � ! f r ! i 9n m m ! r Iw z ! N� I � ! 53 ' 9i5� , J (131d 182 LOT 2 TEMPORARY 60 RADIUS I CSM5C7 CUL DE SAC EASEMENT TO BE REMOVED WHEN "SEE MEET 2 OF 4 SHEETS fOR DETAIL THE ROAD IS EXTENDED OF THIS AREA AND CURVE TABLE` OWNERS OF :C BUIL .OSHKOSH Ql FlCE DING, LLC TAX PARCEL N0: 0020401 . LE /4 X 24' SOLID ROUND IRON REBAR SET, .WE "G 1.502 LBS. PER L IN. FT: ® = 3/4' SOLID ROUND IRON REBAR FOUND ®= 1' LD. ROUND IRON PIPE. FOUND B = BERNTSEN MOKNENT FOUND (} = RECORDED AS BEAM/DISTANCE -X - =. M'TING FENCE ® = CHISEL CROSS FOUND GRAPAIC SLICE 0 150 .3.00 450 So 300 .NORTH 15 REFERENCED TO THE NORTH LINE OF THE ° NORT OST 1/4 OF SECTION 32. TOWNSHIP 18 NORTH. RANGE 16 EAST. TOWN OF ALGOVA, VANNEBAGO COUNTY. WL�CONSII. WHICH BEARS S89'13'5n PER THE WINNE8AGO COUNTY COORDINATE SY5IETL SHEET 1 OF 4 S HEETS ,� �'�LlHgALVERSON F '' . � Iw - .- . -_.__ - CAROW LAND SURVEYING CO., INC. 615 N• LYNNDALE DR.. P.O. BOX 1297 MR MN, NON 54912 -1297 PHONE (920)731 -4168 A067.31 -OB 8- 19 -08. DRAFTED BY: (RDD) STS I AECOM September 16, 2008 Change Order No. 1 Project: Water Filtration Plant Modifications and Demolition Project Owner: City of Oshkosh Contract: 08 -05 Contractor: Miron Construction Description of Change Request for Quote No. 1a Phase I Demolition subgrade improvement, excavation and backfill add $100,905 1 b Elimination of starter walls /water stop on interior baffle walls CT Basin deduct ($9,337) 1 c Security shrouded vents add $3,248 1d Access hatches, ladders and sumps add $6,402 1e Reroute 4 inch sanitary sewer lateral add $6,581 1f Additional reinforcing steel in CT Basin Exterior Walls add $10,449 1g Xypex Concrete Waterproofing Additive add $69,168 1h Replace 1880 Water main add $176,829 1 i Relocate Electrical Ductbank near Clearwells deduct ($5,061) 1j Reduce project work allowance from $200,000 to $0.00 deduct ($200,000) TOTAL VALUE OF THIS CHANGE ORDER ADD $159,184 Contract Price Adjustment Original Contract Price $6,070,273 Previous Change Orders $0 Adjustments in Contract Price this Change Order $159,184 Current Contract Price including this Change Order $6,229,457 This document shall become a supplement to the Contract and all provisions will apply hereto. RECOMMENDED Engineer - CH2MHill or RPR — STS APPROVED Date CONTRACTOR — Miron Construction Date RECOMMENDED BY OWNER Director of Public Works Date APPROVED BY OWNER City Manager Date City Clerk Date I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin under this Change Order. City Comptroller Date APPROVED AS TO FORM: City Attorney Date STS I O