Loading...
HomeMy WebLinkAbout08-350SEPTEMBER 23, 2008 08 -350 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE AMENDMENT NO. 1 / GREMMER & ASSOCIATES, INC./ ENGINEERING SERVICES HIGHWAY41 /45 UTILITY RELOCATION DESIGN ($35,000.00) INITIATED BY: PUBLIC WORKS DEPARTMENT BE IT RESOLVED by the Common Council of the City of Oshkosh that the attached Amendment No. 1 for Engineering Services for sanitary sewer /watermain design related to USH 41 Project with Gremmer & Associates, Inc. is hereby approved and the proper City officials are hereby authorized to execute and deliver the agreement in substantially the same form as attached hereto, any changes in the execution copy being deemed approved by their respective signatures, and said City officials are authorized and directed to take those steps necessary to implement the terms and conditions of the Agreement. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 541 - 1810 - 1799 -00000 Water Utility Construction Work in Progress Acct. No. 551 - 1910 - 1799 -00000 Sewer Utility Construction Work In Progress . .:1AJ & A550C[ATE5, INC. CONSULTING ENGINEERS September 10, 2008 City of Oshkosh 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54902 -1130 Attention: Mr. David Patek, PE Director of Public Works 93 South Pioneer Road, Suite 300 Fond du Lac, W154935 Phone 920- 924 -5720 Fax 920 -924 -5725 Subject: Contract Amendment No. I Engineering services for sanitary sewer / watermain design related to USH 41 project Dear Mr. Patek: The contract made and entered into by and between the City of Oshkosh (OWNER) and Gremmer & Associates, Inc. (ENGINEER), executed on July 1, 2008, is hereby amended as follows: ADDITIONAL SCOPE OF WORK Provide sanitary sewer and water main design services to accommodate the USH 41 expansion projects north of the Lake Butte des Morts bridge (WisDOT Project ID's 1120 -11 -72/73 and 74). The approximate location and lineal footage of sanitary sewer and water main is as follows (see Exhibit A for a schematic map): Project ID 1120 -11 -72 630' watermain along Fountain Avenue 2560' watermain along Snell Road (including 210' of casing pipe bored under USH 41) 580' watermain along Green Valley Road Miscellaneous adjustments/removals of existing valve manholes _ProiectID 1120 -11- 73/74 900' watermain along new Lake Butte des Morts Drive 470' watermain along Snell Road 1460' sanitary sewer along Snell Road 550' sanitary sewer along existing Fernau Avenue 800' sanitary sewer along new Lake Butte des Morts Drive 1380' force main along proposed ramp F (including 350' of triple casing bore under USH 41) The —72 project will be constructed as part of the WisDOT project, therefore the plans and specifications will be formatted to WisDOT specifications. The —73 and —74 projects will be constructed prior to the WisDOT project, and will be combined with the bid documents and bid letting for the Washburn Street utility project ( -71 project). Fond du Lac, WI Stevens Point, W1 A more detailed scope of work is as follows. Items not specifically mentioned below shall be considered additional services. 1. Survey. a. Provide topographic and utility survey for areas not previously surveyed for the USH 41 project (limited to approximately 1000' along Snell Road; -73 project). 2. Utility Design. a. Preliminary /final utility design for utilities as shown in Exhibit A. i. Water main plan and profile. ii. Sanitary sewer plan and profile. iii. Force main plan and profile. iv. Roadway restoration plans. b. Bid documents; -73 and —74 projects. i. Incorporate this additional work into the bid documents for the —71 project. Scope assumes 1 set of bid documents and I bidding for the — 71/73/74 projects combined. ii. Quantities/bid items for the —73/74 projects will be incorporated into the engineer's estimate for the —71 project. c. Bid documents; -72 project. i. Prepare a stand alone WisDOT formatted plan set to be "slip sheeted into the WisDOT plan set for the —72 project. ii. Prepare WisDOT formatted specifications to be incorporated into the WisDOT special provisions for the —72 project. iii. Bid items will be loaded into the WisDOT estimate for the —72 project. 3. DNR Coordination. a. Permitting for municipal sanitary sewer and watermain extensions for work associated with — 72/73/74 projects. 4. WisDOT Permitting. a. Coordinate with WisDOT concerning permitting for working on highway right -of -way, and prepare any necessary permits for OWNER submittal to WisDOT. COMPENSATION ENGINEER'S additional not -to- exceed fee, including reimbursables, for the work listed in the - "Additional Scope of Work" section of this document is $35,000. This increases the total not -to- exceed fee of the contract to $73,000. M AZE _ 2 _ & A590ciArES, IN( AUTHORIZATION AND TIMING If this addendum is acceptable, please sign below and return one copy to us for our files. The receipt of a signed copy of this proposal shall be considered as authorization to proceed with the services described. For the ENGINEER Thomas'Linser, President Gremmer & Associates, Inc Date For the OWNER: City of Oshkosh City Manager Date City Clerk Date City Attorney Date Comptroller Date 3 _ & ASSOCIATES, IN