HomeMy WebLinkAbout08-351SEPTEMBER 23, 2008 08 -351 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE AMENDMENT NO. 2 / MSA / ENGINEERING SERVICES FOR NORTH MAIN STREET ($5,648.46) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the attached Amendment No. 2 between the City of Oshkosh and MSA for engineering services for North Main Street (Algoma Boulevard to Irving Avenue) in the amount of $5,648.46 is hereby approved and the proper City officials are hereby authorized to execute and deliver the agreement in substantially the same form as attached hereto, any changes in the execution copy being deemed approved by their respective signatures, and said City officials are authorized and directed to take those steps necessary to implement the terms and conditions of the Agreement. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 541-1810-1799-00000 — Water Utility Construction Work in Progress Acct. No. 551-1910-1799-00000 — Sewer Utility Construction Work in Progress Amendment No. 2 Date of Issuance: 9/8/08 MSA Project No.: 0930667 This is an amendment to the Agreement dated August 8, 2006 and does acknowledge that MSA Professional Services, Inc. (MSA) is authorized to begin work on the following project amendment: Project Name: North Main Street (Algoma Blvd. to Irving Ave) The project scope has changed due to: -The presence of privately owned vaults and basement extensions within the Main Street right -of -way. -The building addition to the Oshkosh Centre on the southeast corner of the Ceape Avenue and Main Street intersection, which includes raising the sidewalk near the building entrances The scope of the work authorized is: Section VI.A.1 is added as follows to Section A.2.0 of Exhibit A - Basic Services. and. Related Matters) The ENGINEER shall investigate for belowground vaults extending within the highway R/W for buildings built at the R/W limits within the project limits. The ENGINEER shall send a letter in advance notifying the property owner that project personnel will be requesting access to the basements of these buildings for the purpose of vault investigation. The ENGINEER shall design the final roadway grades and elevations to match in with the Oshkosh Centre. The schedule to perform the work is: Approximate Start: 10/1/08 Approximate Completion: 12/8/09 The lump sum fee for the work is: $4,836.55 (Vault Investigation) 811.91 (Additional design work, Ceape Ave) Total Contract Amendment $5,648.46 Authorization for the work described above shall amend the Agreement between MSA and OWNER. Any attachments or exhibits referenced in this Amendment are made Page 1 of 2 G: \projects \90s \931930566\ Contract \City Contract\Amendment #2.doc part of the Agreement. Payment for these services will be on a lump sum basis. Approval: MSA shall commence work on this project in accordance with your written authorization. This authorization is acknowledged by signature of the authorized representatives of the parties to this Amendment. A copy of this Amendment signed by the authorized representatives shall be returned for our files. If a signed copy of this Authorization is not received by MSA within seven days from the date of issuance, MSA may stop work on the project. SIGNED FOR AND IN BEHALF OF THE CITY OF OSHKOSH Mark Rohloff, City Manager Pamela R. Ubrig, City Clerk Lynn Lorensen, Acting City Attorney MSA PROFESSIONAL SERVICES, INC. ov �V Michael J. Statz, P.E. Project Manager Edward A. Nokes, City Comptroller I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. Address for giving notices: Addresses for giving notices: 215 Church Avenue 2901 International Lane, Suite 300 Oshkosh, WI 54903 -1130 Madison, WI 53704 -3133 Phone: (920) 236 -5065 Phone: (608) 242 -7779 Fax: (920) 236 -5068 Fax: (608) 242 -5664 Page 2 of 2 G:\projects \90s \93\930566 \Contract \City Contract\Amendment #2.doc Fee Computation Summary by Engineering Task Main Street, City of Oshkosh (Algoma Blvd - Parkway Ave) PROJECT TOTAL Task Activity ; Direct Labo r Overhead Fixed Fee /Profit Direct Total Code Costs Costs Expenses Project Dev - 740 $204.20 $330.62 $50.81 $30.00 $615.63' Admin /Coordination Design- Reports 748 $0.00 $0.00 $0.00 $0.00 $0.00 Envir Imp- Environmental 767 $0.00 $0.00 $0.00 $0.00 $0.00 Documents Proj Dev- Utilities /RR/Agency 746 $0.00 $0.00 $0.00 $0.00 $0.00 Public Info Meetings & 743 $0.00 $0.00 $0.00 $0.00 $0.00 Hearings Survey - General 729 $0.00 $0.00 $0.00 $0.00 $0.00 Prelim Design - General 741 $1,316.26 $2,131.16 $327.50 $446.00 $4,220.92. Preliminary Structure Design 1001 $0.00 $0.00 $0.00 $0.00 $0.00 Finalize Design Elements 742 $283.10 $458.37 $70.44 $0.00 $811.91 Final Structure Design 1002 $0.00 $0.00 $0.00 $0.00 $0.00 Design -RNV -Plats 745 $0.00 $0.00 $0.00 $0.00 $0.00 Development Project Develop- Meetings 747 $0.00 $0.00 $0.00 $0.00 $0.00 PS &E 794 $0.00 $0.00 $0.00 $0.00 $0.00 Consultant Management 773 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL: $.1;803.56 $2,920.15 $448.75 $476.00' $5,648.46 Negotiated Overhead Rate: 161 >g1 %o Percent Profit. 9.5 %0 157.38% for original contract Contract Amendment #2.xls 918/2008 nt Contract Total Fee Total for Contract( Project ID Original Contract CA #1 CA #2 Work Order Number of 2573 StafR 2502 12 59 I , Hours-: ������ Total Direct Labo $68,884.09 $379.90 $1,803.56 $71,067.55 Total Overhead , $108,409.78 $642.72 $2,920.15 $1 11,972.65' Costs Fixed FeelProfit $16,842.91 $97.15 $448.75 $1.7,388.81 . biiract Expenses $4,030.00 $25.00 $476.00 $4,531.00 Streetscope $045.60 $5�945"D0' ,GArchitectitlre � z , v x tirstorical $ 5 282 00 $5,406.00 $10,688.00 C'oordinafiaor► t subsurface $1,935.00. ,93504. I Negotiated Overhead Rate: 161.91 Percent Protit: y� JI 157.38% for original contract ' Schedule of Subcontracts N NAME OF SUBCONSULTANT _ I Contract Amendment #2.xls 9/8/2008