HomeMy WebLinkAbout08-352SEPTEMBER 23, 2008 08 -352 RESOLUTION
(CARRIED 7 -0 LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVE AMENDMENT NO. 4 / CH2M HILL / ENGINEERING
SERVICES FOR WATER FILTRATION PLANT ($42,819.00)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the attached
Amendment No. 4 between the City of Oshkosh and CH2M HILL for engineering services
for the Water Filtration Plant modifications project in the amount of $42,819.00 is hereby
approved and the proper City officials are hereby authorized to execute and deliver the
agreement in substantially the same form as attached hereto, any changes in the
execution copy being deemed approved by their respective signatures, and said City
officials are authorized and directed to take those steps necessary to implement the terms
and conditions of the Agreement.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Acct. No. 541-1810-1799-00000 — Water Utility Construction Work in Progress
AMENDMENT NO. 4
This Amendment No. 4 is issued pursuant to the Standard Agreement for Professional
Services fully executed on April 2Q, 2007, Amendment No. 1 fully executed September 76,
2007, Amendment No. 2 fully executed April 22, 2008, and Amendment No. 3 fully executed
June 20, 2008 which are incorporated herein by this reference, with respect to Water
Filtration Plant Modifications and Demolition Project.
Specific Services As stated in Attachment 1, Amended Scope Services, incorporated herein
by reference-
Compensation Provisions: As stated in Attachment 1, Amended Scope Services,
incorporated herein by reference.
Work Schedule: June 2008 through June 2009.
The Authorized Representatives d esignated below are authorized to act with respect to the Task
Order. Communications between the parties shall be between parties and their consultants or
subcontractors, through the Authorized Represen tives-
For the Client
For CH2M HILL
Name: City of Oshkosh
Name: CH2M HILL, Milwaukee
Address:
215 Church Avenue, Oshkosh, WI 54903
Address:
1 135 S. 84th Street, Milwaukee, WI 53214
Telephone: 920-232-5365
Telephone: 414.272.2426
This Amendment No. 1 is effective this (date)
Accepted for Client by:
Signature Signature
Title Title
Date Date
Signature Cigna xre
Title Title
Date Date
This Amendment No. 1 is effective this (date)
Accepted fox CH2M HILL by: Allan Erickson
Signature . . . . ....... .. ...... . ..... .... -- . . . ......... ... .... .. — .. .... ....... ..
Title
Date
ATTACHMENT I.- SCOPE OF SERVICES AMENDMENT NO. 4
City of Oshkosh Water Filtration Plant
Modifications and Demolition Project I
11111liq IIIIII i iiiiiii iiiiiiii 11111
In addition to the Design Scope of Services (April 20, 2007), Amendment No. 1 (September
26, 2007), Amendment No. 2 (April 22, 2008), Amendment No. 3 (June 20, 2008),
CH2M HILL completed the engineering services described below.
In response to the needs of the City of Oshkosh, CH21M IULL conducted additional
engineering evaluation of the Water Filtration Plant water tower and assisted the City with
public involvement regarding the Water Filtration Plant Modifications and,'Demolition
Project. Engineering activities focused on developing alternatives to deliver the
project to meet Wisconsin Department of Natural Resources requirements and maintain the
water tower. Budgetary cost estimates and schedules were prepared to inform, City decision
makers. Task activities are highlighted as follows:
• Updated the water tower memorandum in response to community concerns
• Evaluated three Low Lift Pump Station altematives in order to retain the water
tower. Prepared conceptual design sketches and conceptual level cost estimates.
• Assisted the City in retaining the services of Cornerstone Preservation to address
historic aspects of the project. Provided quality control review of Cornerstone
Preservation task report.
• Collaborated with the STS/AECOM on the structural and demolition design aspects
of the water tower alternatives. Provided quality control review of STS/ AECOM
task report.
• Prepared a PowerPoint presentation and delivered it to City Council and the public
during the May 20, 2008, workshop on the project alternatives related to the water
tower.
• Participated in,May City Council meeting to address questions on the water
tower project alternatives.
• Responded to requests for information related to historic aspects of the existing
facilities from the WT)NR, Water Regulatory Permit and Approval for Grading more
than 10,000 square feet adjacent to Lake Winnebago.
Engineering Services Related to Post Phase 1 Demolition
The City successfully completed Phase 1 demolition of the east sedimentation basin and the
west sedimentation basin. Subsurface conditions below these basins were not as anticipated.,
ATTACHMENT I - 600f'E OF SERVICES AMENDMENT NO.2
CITY OF OSHKOSH WATER FILTRATION PLANT MODIFICATIONS AND OEMOUT109PROJECT
based on subsurface investigation conducted previously around the basins. To define,
manage, and develop economical solutions for the geotechnical issues, STS /AECOM;
performed the following task activities:
4 Made onsite observations and took measurements to assist the City and CH2M HILL
in determining extent of poor soils to be removed.
Y Worked as liaison between Contractor, City, and CH2M HILL to define specific
work needed to bring the site from post Phase 1 demolition condition to a starting
condition that matched the Modifications and Demolition Project contract
documents.
Developed a plan: for additional testing requirements with CH2M HILL-
6 Assisted Engineer in revising the plan for CTIBWS Basin subgrade ;preparation
based on actual field conditions.
Identify spoil disposal locations to minimize costs.
« Facilitated meetings with the City and Engineer to present information and make
decisions. Maintained a record of decisions.
0 Conducted observations c>f the "Work for conformance with contract documents and
City's future potential improvement plans for site.
i Monitored material quantities and maintained records . of work (no. of trucks, test
reports, etc.).
0 Monitored the sediment and erosion control practices onsite to assist the City avoid
violation with pending stormwater permit approvals.
Reviewed applications for additional compensation by change order.
Additional engineering services were required by Kaempfer & Associates, Inc. to respond to
requests from the Wisconsin Department of Natural resources to obtain. the Notice of intent
and Chapter 30 stormwater permits. The additional effort was primarily related to historic
aspects of the existing facilities to be demolished.
Project Management and Documentation
CH2M HILL managed the technical work and communication during resolution of the
project issues described in this Amendment. CH2M HILL provided duality control review
of Work and expedited decisions to assist in maintaining the project schedule. Technical
information and conversations were documented.
o , as
ATTACHMM 1- SCOPE OF SERVICES AMENDMENT No. 2
CITY OF OSHKOSH WATER FILTRATION PLANT MODIFICATIONS 91D DEMOLITION PROJECT
TABLE 1
Additional Enginoting Services
Item Activity cost
I Additional Evaluation of Water Tower Alternatives $21,821
2 Post Phase 1 Demolition Site Preparation $15,476
3 Stormwater Permits $1,150
4 Project Management and Documentation $4,372
Total Additional Services, Project Amendment No. 4 $42,819
TABLE
WFP Modifications and Demolition Project, Amended: Compensation Summary
Task Contract Value
Current Contract for Professional Engineering Services $998,490
Project Amendment No. 4 Services $42,819
Total Amended Contract for Engineering Services $1,041,309
,1111111
� IN
The professional services associated with the Additional Evaluation of Water Tower
Alternatives were not directly integral to the design and construction of the City of Oshkosh
Water Filtration Plant Modifications and Demolition Project. Consequently, the value of
these services, $21,821, is not eligible for inclusion in the Safe Drinking Water Loan.