Loading...
HomeMy WebLinkAbout0132777-Plumbing (repair water lateral)OSHKOSH ON THE WATER Job Address 232 236 N CAMPBELI Rn CITY OF OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD Owner RIVERWATCH LLC Contractor BERNDT EXCAVATING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work No 132777 Create Date 09/08/2008 Category 430 -Industrial-Exterior (laterals) Plan Shower Water Softner Wait. St. Shamp Sink Coffee Maker Floor Drain Local Waste Ice Chest Flr/Vllst Sink Int Grease Trap Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap _ Disposal Bidet Sculry Sink Wash Ftn RPZ Valve Dishwasher Beer Tap __ Hand Sink Urinal Eye Wash Statn Sump Pump Lab Sink Plaster Sink Standp Rec _. ---- Wtr Sewer Mtrs Classrm Sink Sterilizer Surgeons Sink _ Ice Maker Deduct Meters Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Ejector/Grind Drink Ftn Serv Sink Soda Disp Valuation $2,000.00 Plan Approval $0.00 Permit Fees $50.00 ^ Permit Voided Issued By ~, Date 09/09/2008 In the pertormance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement hol r )and to c e necessary app~ov`f'oFe starting such activity. Signature ~j...~-V ` ~~.~/ZJ~,,,~~. ~_'~ Date ~ .-~ ~ ~~-~ J Address 2527 W WAUKAU AVE Agent/Owner OSHKOSH WI 54904 - 8986 Telephone Number 235-3331 ~~~~~W~~~ n~aNc~~w~~s please can ine mspecuon Kequest nne at z3ti-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not pertormed within two business days from the time the project is ready.