HomeMy WebLinkAbout0132777-Plumbing (repair water lateral)OSHKOSH
ON THE WATER
Job Address 232 236 N CAMPBELI Rn
CITY OF OSHKOSH
PLUMBING PERMIT -APPLICATION AND RECORD
Owner RIVERWATCH LLC
Contractor BERNDT EXCAVATING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
No 132777
Create Date 09/08/2008
Category 430 -Industrial-Exterior (laterals) Plan
Shower Water Softner Wait. St. Shamp Sink Coffee Maker
Floor Drain Local Waste Ice Chest Flr/Vllst Sink Int Grease Trap
Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap _
Disposal Bidet Sculry Sink Wash Ftn RPZ Valve
Dishwasher Beer Tap __ Hand Sink Urinal Eye Wash Statn
Sump Pump
Lab Sink
Plaster Sink
Standp Rec _. ----
Wtr Sewer Mtrs
Classrm Sink Sterilizer Surgeons Sink _
Ice Maker Deduct Meters
Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Ejector/Grind Drink Ftn Serv Sink Soda Disp
Valuation $2,000.00 Plan Approval $0.00 Permit Fees $50.00 ^ Permit Voided
Issued By ~, Date 09/09/2008
In the pertormance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement hol r )and to c e necessary app~ov`f'oFe starting such activity.
Signature ~j...~-V ` ~~.~/ZJ~,,,~~. ~_'~ Date ~ .-~ ~ ~~-~ J
Address 2527 W WAUKAU AVE
Agent/Owner
OSHKOSH
WI 54904 - 8986 Telephone Number 235-3331
~~~~~W~~~ n~aNc~~w~~s please can ine mspecuon Kequest nne at z3ti-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not pertormed within two business days from the time the project is ready.