HomeMy WebLinkAbout2008-Building (exterior)CITY OF OSHKOSH No 132741
OSHKOSH
ON THE WATER
Job Address 1060 MARICOPA DR
BUILDING PERMIT -APPLICATION AND RECORD
Designer
Category 141 -Exterior Remod~
Create Date 09/08/2008
Plan
Type ~ Building Q Sign Q Canopy Q Fence Q Raze
Zoning Class of Const: Size
Unfinished/Basement Sq. Ft. Rooms Height Ft. ^ Projection
Finished/Living Sq. Ft. Bedrooms Stories Canopies
Garage Sq. Ft. Baths Signs
Foundation ~ Poured Concrete Q Floating Slab Q Pier Q Other
Q Concrete Block Q Post Q Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature
of Work
FR/ Removing the existing split field stone on the front of the house and installing foam and siding to match the rest of the house.
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $1,000.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedication $0.00
Issued By: ~ 1lN Date 09/08/2008 Final/O.P. 00/00/0000
^ Permit Voided Parcel Id # 1312940000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
I hgave read and un erstand ~t{e aflgye me ed i ~ ation. ~~~ G~-
Si nature jJ.( ~,l/ Date
Address 1955 SKYRANCH AVE
Owner FRANK A ZUERN
Contractor BOB GRIFFIN CARPENTRY
Agent/Owner
OSHKOSH
WI 54904 - 0000
Telephone Number 235-4153
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.