Loading...
HomeMy WebLinkAbout0132498-Building (3 seasons room)CITY OF OSHKOSH No 132498 OSHKOSH ON THE WATER Job Address 1339 WINNEBAGO AVE Designer Create Date 08/26/2008 Category 152 - Addn/Alt to Accessory Building (Res) Plan Type ~ Building ~ Sign ~ Canopy Q Fence ~ Raze Zoning Class of Const: 8 Size 18x20 Unfinished/Basement Sq. Ft. Rooms Height Ft. ^ Projection Finished/Living Sq. Ft. Bedrooms Stories 1 Canopies Garage Sq. Ft. Baths Signs Foundation ~ Poured Concrete ~ Floating Slab Q Pier ~ Other Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 1 Use/Nature of Work BUILDING PERMIT -APPLICATION AND RECORD FR/ Build a three seasons room off of rear of garage. Room is 279 sf with an 81 sf uncovered patio. InGudes wood stove. Replace eads/railings on rear steps. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plan Approval $0.00 Permit Fee Paid $88.00 Park Dedication $0.00 Date 08/26/2008 Final/O.P.00/00/0000 ^ Permit Voided Parcel Id # 0206610000 In the performance of this work I agree to perform ail work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary appr vals before starting such activity. I have read and der nd the afor e i d i formation. ~~- y~ Signature Date ~~r~1 ~~?~~°~ ~/T Agent/Owner --~ Address 1335 WINNEBAGO AVE OSHKOSH WI 54901 - 5334 Telephone Number (920) 426-4359 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not pertormed within two business days from the time the project is ready. Plumbing Contractor SCRAPER ELECTRIC INC Owner DEVON E/SUSAN K JONES Contractor BRU NICK BUILDERS