Loading...
HomeMy WebLinkAbout132430-Plumbing (laterals)OSHKOSH ON THE WATER Job Address 760 KIRKWOOD DR Contractor ZILLGES EXCAVATING CITY OF OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Owner MARK M/DEBRA G MEHLBERG No 132430 Create Date 08/25/2008 Category 401 -Residential-Exterior (laterals) Plan Shower Water Softner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest FIrIV11st Sink Lndry Tray Clothes Wshr Exam Sink Catch Basin Disposal Bidet Sculry Sink Wash Ftn Dishwasher Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Valuation $1,500.00 Plan Approval $0.00 Permit Fees $100.00 ^ Permit Voided Issued By Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Date 08/25/2008 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) an o secure any Qecessary approvals before starting such activity. ~j~ Signature v/f/~~ JrJL Date ~~- y~~~ ,~rl Address 1800 FOUNTAIN AVE Agent/Owner OSHKOSH WI 54904 - 1045 Telephone Number 231-1994 ~ o scneauie inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.