Loading...
HomeMy WebLinkAbout0132347-PlumbingOSHKOSH ON THE WATER Job Address 220 N WESTFIELD ST CITY OF OSHKOSH No 132347 PLUMBING PERMIT -APPLICATION AND RECORD Rev - sed Contractor J RASMUSSEN PLUMBING INC Bathtu b Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Owner BETHEL HOME INC Create Date 08/20/2008 Category 441 -Industrial-Water Heaters Plan _ Shower 1 Water Softner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest FlrlVllst Sink 2 Lndry Tray Clothes Wshr 1 Exam Sink Catch Basin _ Disposal 1 Bidet Sculry Sink Wash Ftn 1 Dishwasher 1 Beer Tap Hand Sink Urinal _ Sump Pump Lab Sink Plaster Sink Standp Rec _ Classnn Sink Sterilizer Surgeons Sink Ice Maker _ Breakrm Sink Dip Well F Prep Sink Gar Drain _ Ejector/Grind Drink Ftn Serv Sink Soda Disp Coffee Maker _ Int Grease Trap Ext Grease Trap _ RPZ Valve Eye Wash Statn 2 Wtr Sewer Mtrs _ Deduct Meters Wtr Usage Mtrs Valuation $4,000.00 Pian Approval $0.00 Permit Fees $63.00 ^ Permit Voided Issued By Date 08/20/2008 In the pertormance of this work, I agree to perform all work pursuant to rules governing the described construction. Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1914 GREENBRIAR TRL OSHKOSH WI 54904 - 8887 Telephone Number 920-231-1289 r o scneauie inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not pertormed within two business days from the time the project is ready.