Loading...
HomeMy WebLinkAboutFinal (Bldg,Elec & HVAC) - 10/9/2000CORRECTION NOTICE /FIELD INSPECTION REPORT City of Oshkosh JOB LOCATION: O~ 1'S ~ ~L~A~i .t`~~t~. ,f Inspection Services Division 215 Church Avenue, PO Box 1130 CQNTRACTOR' ~~~cL~ Oshkosh, WI 54903-1130 Phone: (920) 236-5050 Fax (920) 236-5084 PROJECT TO BE INSPECTED:_ 1 S t~~. OY w~L~) BUILDING: Footing HVAC: Rou h ELECTRIC: R h PLUMBING: EROSION CONTROL: PROPERTY MAINT.: Foundation g Furnace oug Service Rough Test On Tracking Silt Fence Setback Park. Unlicensed Veh Rough Insulation A/C Fireplace Temp Perm UG OH Underfloor Sewer/Water Stone Access Straw Bales Garbage Dilapidated bld's fences Re-insp. Re-in~J a( ~ - Re-msp Re-insp. Re-insp. , , etc Final Final X ~T ~ ta~~t ^:__~ . ITEM# ..CODE INSPECTION RESULTS C~l~ P~'~S ~-4-- Q.. t~c~ ~_ Ate 4 ~ ~ ~S ~~ Q ~2~..p ~ ~ ~ ~~~ ts-cS ~4.19t_ ~S ~ RAJ FhQ ~ ~ ~--~ `~~cTkraf ~ S i k.. - ~~.~i.~ S I U~... 1 ~ ~~ ~~ S I~I~T $~ //~ I VIOLATIONS MUST BE CORRECTED AND APPROVED WITHIN 30 DAYS UNLESS OTHERWISE NOTED. CALL FOR RE-INSPECTIONS PRIOR TO CONCEALMENT AND/OR OCCUPANCY. WHEN CORRECTIONS ARE COMPLETED THE OWNER/CONTRACTOR IS REQUIRED TO SIGN & DATE THIS NOTICE AND RETURN IT TO THE INSPECTION DIVISION WHEN REQUESTING A RE INSPECTION COMPLIANCE DATE: ~ ~-~ ACTION TAKEN: Not Approved/ Insp. Report left on site ^ Not Approved/ Insp. Report given to ^ Mailed/Faxed Signed ti Inspection Services Division 10~~(~ o~3to- ~~1,~-. Date of Inspection Phone # I hereby certify that the violations at the above address have been corrected.