Loading...
HomeMy WebLinkAboutPlumbing ZZ3-322-0808-PCity of Oshkosh Inspection Services 215 Church Ave., PO Box 1130 Oshkosh, WI 54902-1130 (920) 236-5052 (920) 236-5184 FAX O.fHKOfH ON THE WATER August 15, 2008 Romes Design, Inc. 1600 Shawano Ave. #209 Green Bay, WI 54303 City of Oshkosh Fire House (remodel) Ref: Plumbing Plan Approval: 101 Ceape Ave., Oshkosh, WI Plan ID# ZZ3-322-0808-P Dear Sirs, Examination of the plumbing plans and specifications for this project has been completed. In accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin Administrative Code, the plumbing plans and specifications are approved contingent upon compliance with the stipulation(s) noted below. 1. Discharge of wall outlet fixtures into a circuit vented branch drain is prohibited. COMM 82.31 2. Urinal spacing shall comply with COMM 84.20 3. Loading on 1/2 inch diameter water supply piping shall not exceed 2 WSFU when supplying two or more fixtures per COMM 82.40 In the event installation of this plumbing system has not commenced within two years from this date, this approval shall become void. Anew application accompanied by full examination fees shall be filed and an updated approval received before work may commence. In granting this approval, the City of Oshkosh or its representative does not hold itself liable for any defects in plans or specifications, plan omissions, examination oversight, construction or any damage that may result in or after installation. The City of Oshkosh reserves the right to order changes or additions should conditions arise making this necessary. It shall be necessary for the installing plumber to obtain a plumbing permit from the City of Oshkosh before proceeding with actual installation of this plumbing system or any of its parts. Respectfully, Richard Wood, Plumbing Inspector