Loading...
HomeMy WebLinkAbout0132174-Building (roof) OSHKOSH ON THE WATER Job Address 40 VICTORIA CT Designer CITY OF OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD Owner PAUL G/BETTY J KONRAD Contractor OWNER Category 141 -Exterior Remodeling Plan Type ~ Building ~ Sign ~ Canopy [~ Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. ^ Projection Finished/Living Sq. Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation ~ Poured Concrete ~ Floating Slab ~ Pier ~ Other Concrete Block 0 Post ~ Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Park Dedication # Dwelling Units 0 Height Permit # Structures 0 Use/Nature ~FR/ Re-roofing* The house and attached garage. The old shingles will be re of Work a doing the work. LLC will No 132174 Create Date 08/11/2008 HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $14,000.00 Plan Approval $0.00 Permit Fee Paid _ Issued By: ^ Permit Voided $112.00 Park Dedication $0.00 Date 08/11/2008 Final/O.P.00/00/0000 Parcel Id # 1417590000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. I have read and understa a afore mention nformation. Signature )G_ c ~ a----~-_. Date X ~3 l! f ~0~ Address Agent/Owner Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.