Loading...
HomeMy WebLinkAboutPlumbing ZZ8-319-0808-PO.fHKQIH ON THE WATER City of Oshkosh Inspection Services 215 Church Ave., PO Box 1130 Oshkosh, WI 54902-1130 (920) 236-5052 (920) 236-5184 FAX August 11, 2008 D. R. Hansen Plumbing Inc. 55 Knapp Street Oshkosh, WI 54902 Social Security Administration Office Ref: Plumbing Plan Approval: 400 B City Center, Oshkosh, WI Plan ID# ZZ8-319-0808-P Dear Sirs, Examination of the plumbing plans and specifications for this project has been completed. In accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin Administrative Code, the plumbing plans and specifications are approved contingent upon compliance with the stipulation(s) noted below. 1. Water calculation approved based on contractor supplied available low pressure of 72 psi at the construction site. COMM 82.40 2. Drain vent approval based on building sewer existing with full size vent supplied as existing. COMM 82.31 In the event installation of this plumbing system has not commenced within two years from this date, this approval shall become void. Anew application accompanied by full examination fees shall be filed and an updated approva( received before work may commence. In granting this approval, the City of Oshkosh or its representative does not hold itself liable for any defects in plans or specifications, plan omissions, examination oversight, construction or any damage that may result in or after installation. The City of Oshkosh reserves the right to order changes or additions should conditions arise making this necessary. It shall be necessary for the installing plumber to obtain a plumbing permit from the City of Oshkosh before proceeding with actual installation of this plumbing system or any of its parts. Respectfully, Richard Wood, Plumbing Inspector