HomeMy WebLinkAbout08-257AUGUST 12, 2008 08 -257 RESOLUTION (CARRIED 6 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: CHANGE ORDER NO. 1, PUBLIC WORKS CONTRACT NO. 07 -01 BALDWIN DETENTION BASIN (- $308.47) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: RADTKE CONTRACTORS INC. 6408 Cross Road Winneconne, WI 54986 Net Decrease to contract: - ($308.47) PURPOSE: See attached Change Order. CHANGE ORDER # 1 DATED: July 11, 2008 TO: Radtke Contractors Inc. 6408 Cross Road Winneconne, WI 54986 Your present contract with the City of Oshkosh, Contract No. 07 -01 , is hereby amended and changed as follows: NET DECREASE TO: CONTRACT 07 -01 - BALDWIN DETENTION BASIN ($308.47) NET DECREASE TO CONTRACT 07 -01 ($308.47) CITY OF OSHKOSH BY: Recommended: Director of Public Works City Manager City Clerk Approved and accepted: Contractor ecL r� F p�fQ.4rrnr6 D Fr =.�f� I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 07 -01 BALDWIN DETENTION BASIN - CHANGE ORDER # 1 CONTRACT 07 -01 - BALDWIN DETENTION BASIN ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT Class III Storm Sewer, PRICE PRICE 100. Approx. 30 square yards of 3 %" asphaltic concrete pavement, with base, complete as specified, per square vard 3o-nn 1. An s an CV)n nn 0.7n nn Page 2 101. Furnish and install approx. 48 linear feet of 24" RCP Class III Storm Sewer, complete as specified, per linear foot 48.00 48.00 $90.00 102. Furnish and install approx. 30 linear feet of 48" x 76" HERCP Class III Storm Sewer, complete as specified, per linear foot 30.00 30.00 1 $400.00 103. Furnish and install 24" Class III Apron Endwall with Trash Rack at one (1) location, complete as , specified, each 1.00 1.00 $1,500.00 104. Fumish and install 48" x 76" HERCP Class Ili Apron Endwall with Trash Rack at one (1) location, complete as specified, each 1.00 1.00 $7,500.00 105. Furnish and install materials to construct Baldwin Pond Discharge Chamber (including Tideflex), complete as s ecified, lump sum 1.001 1.00 $30,000.00 106. Abandon approx. 110 lineal feet of 30" storm sewer, completed as specified, per linear foot 110.00 110.00 $45.00 107. Clear approx. 302 inch - diameter of existing trees for excavation of Baldwin Pond, per inch - diameter 302.00 1 228.20 -73.80 $4.97 $366.56 108. Grub approx. 302 inch - diameter of existing stumps for excavation of Baldwin Pond, per inch - diameter 302.00 299.20 1 1 -2.80 (M 071 1 ($13.91 109. Excavate and grade Baldwin Pond, lump sum 1.00 1.00 $44,100.00 Page 2 CONTRACT: 07 -01 BALDWIN DETENTION BASIN - CHANGE ORDER # 1 ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 110. Furnish and install approx. 787 linear feet of cast -in- place Retaining Wall, per linear foot 78 7.00 787.00 1 $114.36 111. Plant and seed Baldwin Pond, lump sum 1.00 1.00 $20,000.00 112. Provide $700.00 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.001 1.00 1 1 $700.00 BID ITEMS 100 -112 SUB- TOTALS $72.00 ($380.47) NET DECREASE TO: CONTRACT 07 -01 ($308.47) Page 3