HomeMy WebLinkAbout0132001-Building (floor & handrails)~1
OSHKOSH
ON THE WATER
Job Address 2737 HARRISON ST
Designer
Category 211 -Alteration Industrial
Plan C7-2370-0508
Type ~ Building Q Sign ' ~ Canopy ~ Fence ~ Raze
Zoning Class of Const: Size
Unfinished/Basement Sq. Ft. Rooms Height Ft. ^ Projection
Finished/Living Sq. Ft. Bedrooms Stories -.. Canopies-
Garage Sq. Ft. Baths ' Signs
Foundation ~ Poured Concrete Q Floating Slab Q Pier ~ Other ; . „ ~ ,
Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Not Required Occupancy fee $0.00 Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
Use/Nature IND/ Construction of floor grating and handrails as per plans
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
CITY OF OSHKOSH No 132001
BUILDING .PERMIT -APPLICATION AND RECORD
Owner OSHKOSH CORPORATION. Create Date 08/04/2008
Contractor AURORA WELDING
Plumbing Contractor
Plan Approval $0.00 Permit Fee Paid
$193.00 Park Dedication $0.00
Date 08/04/2008 Final/O.P. 00/00/0000
^ Permit Voided
Parcel Id # 1519600000
In the pertormance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to s r necess approvals before starting such activity.
I have read and tan the a r entioned information. ^~ ccll ~t
Signatu[ Date w v G Q
Agent/Owner
Address W2108 CUMBERLAND DR BERLIN WI 54923 - 0000 Telephone Number 920-361-2498
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.