Loading...
HomeMy WebLinkAbout0132001-Building (floor & handrails)~1 OSHKOSH ON THE WATER Job Address 2737 HARRISON ST Designer Category 211 -Alteration Industrial Plan C7-2370-0508 Type ~ Building Q Sign ' ~ Canopy ~ Fence ~ Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. ^ Projection Finished/Living Sq. Ft. Bedrooms Stories -.. Canopies- Garage Sq. Ft. Baths ' Signs Foundation ~ Poured Concrete Q Floating Slab Q Pier ~ Other ; . „ ~ , Concrete Block 0 Post 0 Treated Wood Occupancy Permit Not Required Occupancy fee $0.00 Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use/Nature IND/ Construction of floor grating and handrails as per plans of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: CITY OF OSHKOSH No 132001 BUILDING .PERMIT -APPLICATION AND RECORD Owner OSHKOSH CORPORATION. Create Date 08/04/2008 Contractor AURORA WELDING Plumbing Contractor Plan Approval $0.00 Permit Fee Paid $193.00 Park Dedication $0.00 Date 08/04/2008 Final/O.P. 00/00/0000 ^ Permit Voided Parcel Id # 1519600000 In the pertormance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to s r necess approvals before starting such activity. I have read and tan the a r entioned information. ^~ ccll ~t Signatu[ Date w v G Q Agent/Owner Address W2108 CUMBERLAND DR BERLIN WI 54923 - 0000 Telephone Number 920-361-2498 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.