HomeMy WebLinkAbout0131917-Building (parking lot) CITY OF OSHKOSH No 131917
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 1100 W SMITH AVE Owner OSH AREA SCHL DIST NORTH HIGH Create Date 07/30/2008
Designer Contractor OSHKOSH AREA SCHOOL DISTRICT
Category 256 -Parking Lots, Driveways ' Plan
Type ~ Building ~ Sign ~ Canopy ~ Fence Q Raze
Zoning Class of Const: Size
Unfinished/Basement Sq. Ft. Rooms ' Height Ft. ^ Projection
Finished/Living Sq. Ft. Bedrooms Stories Canopies
Garage Sq. Ft. Baths Signs
Foundation ~ Poured Concrete ~ Floating Siab Q Pier ', Q Other
Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
Use/Nature
of Work
3" pavement, install two course 4 inch pavement as per plans on West Parking Lot. All drainage
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $205,480.00 Plan Approval $0.00 Permit Fee Paid
Issued By:
^ Permit Voided
$706.00 Park Dedication $0.00
Date 07/30/2008 Final/O.P.00/00/0000
Parcel id # 1219400000
In the pertomtance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
have read n u rstand the e m tinned information.
Signature ~ Date @ a
Agent/Owner
Address PO BOX 3048 Oshkosh ' WI 54901 - 0000 Telephone Number 292-4275
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.