Loading...
HomeMy WebLinkAbout0131917-Building (parking lot) CITY OF OSHKOSH No 131917 OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 1100 W SMITH AVE Owner OSH AREA SCHL DIST NORTH HIGH Create Date 07/30/2008 Designer Contractor OSHKOSH AREA SCHOOL DISTRICT Category 256 -Parking Lots, Driveways ' Plan Type ~ Building ~ Sign ~ Canopy ~ Fence Q Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms ' Height Ft. ^ Projection Finished/Living Sq. Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation ~ Poured Concrete ~ Floating Siab Q Pier ', Q Other Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use/Nature of Work 3" pavement, install two course 4 inch pavement as per plans on West Parking Lot. All drainage HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $205,480.00 Plan Approval $0.00 Permit Fee Paid Issued By: ^ Permit Voided $706.00 Park Dedication $0.00 Date 07/30/2008 Final/O.P.00/00/0000 Parcel id # 1219400000 In the pertomtance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. have read n u rstand the e m tinned information. Signature ~ Date @ a Agent/Owner Address PO BOX 3048 Oshkosh ' WI 54901 - 0000 Telephone Number 292-4275 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.