HomeMy WebLinkAbout0131902-Plumbing (water heater)/~ CITY OF OSHKOSH
OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 510 MARION RD Owner D & F INVESTMENTS
Contractor MOREMAN PLBG & HTG SERVICE INC Category 441 -Industrial-Water Heaters
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
_ Shower Water Softner Wait. St. Shamp Sink
_ Floor Drain Local Waste ' Ice Chest FIrIWst Sink
Lndry Tray Clothes Wshr ' Exam Sink Catch Basin
_ Disposal Bidet Sculry Sink Wash Ftn
Dishwasher Beer Tap ' Hand Sink Urinal
_ Sump Pump Lab Sink Plaster Sink Standp Rec
1 Classrm Sink Sterilizer Surgeons Sink Ice Maker
_ Breakrm Sink Dip Weli ' F Prep Sink Gar Drain
_ Ejector/Grind Drink Ftn Serv Sink Soda Disp
No 131902
Create Date 07/29/2008
Plan
Coffee Maker
Int Grease Trap _
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Valuation $600.00 Plan Approval $0.00 Permit Fees $25.00 ^ Permit Voided
Issued By ~/j/j~) ' '~ Oate 07/29/2008
In the pertormance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you pertorm the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address PO BOX 1325
--
Agent/Owner
OSHKOSH WI 54903 - 1325 Telephone Number (920) 231-9191
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not pertormed within two business days from the time the project is ready.