Loading...
HomeMy WebLinkAboutLetter (flashing porch) - 10/23/2000OIHKOIH ON THE WATER Jim Kubasta City of Oshkosh [)ivision of Inspection Services I S Church Avenue PO E3ox 1130 Oshkosh W154902-t 130 O(ticc 920-236-050 Fax 920-336-084 2565 Gaslight Crt Oshkosh WI 54904 /~~~ Re: Flashing Porch Stoops; I~zcnville Ln Dear Jim; October 23, 2000 We have considered your request to use the Lexell caulk. When considering a request to vary from a specific code requirement, we must determine if the varied method is equivalent to what the code requires. Similaz to how Variances aze considered or alternate In this case Comm 21.26(7)(a)3. requires metal flashing between wood and masonry when installing masonry or concrete against the wood framing of a house. The metal flashing is installed to prevent moisture from running between the concrete and wood and to prevent the transfer of moisture from the concrete to the wood. It is also installed so the house wrap overlaps the flashing so any moisture that gets behind the siding does not seep behind the flashing. In your request, you have requested to use caulk in lieu of the properly installed flashing. While the caulk may prevent water from seeping between the surface of the porch stoop and the siding starter channel, it does not address the code requirement to install the flashing the full depth of the wood that is covered by the concrete to direct moisture away from the house wall. Additionally, should moisture find its way behind the siding, the caulk would prevent the water from seeping out away from the house as flashing would direct moisture in this manner. This office is also of the opinion that caulk is not a long term solution or remedy, in that it would require one to provide regulaz maintenance, whereas metal flashing is a long term, maintenance free method of repelling moisture. Based on these issues, we must deny your request to use caulk instead of the code required flashing. We would expect to reinspect these dwelling units for compliance with the noted items no later than November 3`d' When the flashing is installed, we want to reinspect the flashing for compliance prior to pouring new concrete. Please arrange for this inspection 1 day in advance. If you have further questions, please call me at 236-5045. Sincerely; off tf spection Serv' s