HomeMy WebLinkAbout0131850-Building (siding)
OSHKOSH
ON THE WATER
Job Address 1600 BRENTWOOD DR
Designer
Category 141 -Exterior Remodelin
Type + Building
Zoning
CITY OF OSHKOSH No 131850
BUILDING PERMIT -APPLICATION AND RECORD R ~ V I ~ E
Create Date 07/25/2008
Plan
Raze
Size
Ft. ^ Projection
Canopies
Signs
Canopy
Class of Const:
Unfinished/Basement Sq. Ft.
s Rooms Height
Finished/Living Sq. Ft. Bedrooms Stories
Garage Sq. Ft. ~ Baths
Foundation ~ Poured Concrete 0 Floating Slab ^ Pier ~ Other
^ Concrete Block ~ Post ^ Treated Wood
Occupancy Permit Required Occupancy F ee _ $0.00 Flood Plain __
Park Dedication __ ~ # Dwelling Units 0
UselNature SFR/ Replacing some damaged siding on the house. No structural work
of Work
Height Permit
# Structures
0
Owner GARY E/AMY M VOLKMAN
Contractor SALZIEDER BUILDERS
Fence
HVAC Contractor
Electric Contractor
Fees: Valuation $2,800.00 Plan
Issued By:
Plumbing Contractor
$0.00 Permit Fee Paid $39.00 Park Dedication $0.00
Date 07/25/2008 Final/O.P. 00/00/0000
^ Permit Voided ~ Parcel Id # 1318110000
In the pertormance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
I have read and understand the afore mentioned information.
Signature Date
Agent/Owner
Address 2470 NEWPORT COURT OSHKOSH WI 54904 - 7317 Telephone Number 233-4850
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
•` ~ .