HomeMy WebLinkAbout0121736-Building (front porch) � �n�°rth�°���'°�, ��. Esti m ate
333Q Leonatd Point Lane
OShkOSh, WI 54904 DATE ESTIMATE NO.
' 9/22/2006 1113
NAMElADDRESS
A1 Shute
2315 High Oak Drive '
Oshkosh,WI 54902
PROJECT
DESCRIPTION QTY COST TOTAL
Labor cost to remove deck,railing,colmm�s and any thing else to 420.00 420.00
ready for new conshuction and haul away.
Labor cost to build new deck with 3/4"osb and 2x6 framed walls �j S� 1,280.00 1,280.00
with 4'extended roof over&nnt door with eyebrow roof on side to
tie in with lower roof,install new&nnt door and tw�windows.
Labor cost to do exterior siding and soffit and roofing. (�qp,pp 640.pp
Material allowance for the above work.(includes all materials for 5,565.00 5,565.00
the above work and 51200 allowance for windows and S2000
allowance for&ont cluor.
Jim Longworth 379-I 179
rora� �,,�S.00