Loading...
HomeMy WebLinkAbout0121736-Building (front porch) � �n�°rth�°���'°�, ��. Esti m ate 333Q Leonatd Point Lane OShkOSh, WI 54904 DATE ESTIMATE NO. ' 9/22/2006 1113 NAMElADDRESS A1 Shute 2315 High Oak Drive ' Oshkosh,WI 54902 PROJECT DESCRIPTION QTY COST TOTAL Labor cost to remove deck,railing,colmm�s and any thing else to 420.00 420.00 ready for new conshuction and haul away. Labor cost to build new deck with 3/4"osb and 2x6 framed walls �j S� 1,280.00 1,280.00 with 4'extended roof over&nnt door with eyebrow roof on side to tie in with lower roof,install new&nnt door and tw�windows. Labor cost to do exterior siding and soffit and roofing. (�qp,pp 640.pp Material allowance for the above work.(includes all materials for 5,565.00 5,565.00 the above work and 51200 allowance for windows and S2000 allowance for&ont cluor. Jim Longworth 379-I 179 rora� �,,�S.00