HomeMy WebLinkAbout0131765- Plumbing (water heater)0 CITY OF OSHKOSH No 131765
OSHKOSH
ON THE WATER
Job Address 803 N LARK ST
Contractor SAMMONS PLUMBING
PLUMBING PERMIT - APPLICATION AND RECORD
Owner CYNTHIA A FRANK
Category 411 - Residential -Water Heaters
Bathtub
Shower
Water Softner
Wait. St.
Whirlpool
Floor Drain
Local Waste
Ice Chest
Lavatory
Lndry Tray
Clothes Wshr
Exam Sink
Toilet
Disposal
Bidet
Sculry Sink
Res. Sink
Dishwasher
Beer Tap
Hand Sink
Bar Sink
_ Sump Pump
Lab Sink
Plaster Sink
Water Heater
1 Classrm Sink
Sterilizer
Surgeons Sink
Site Drain
Breakrm Sink
Dip Well
F Prep Sink
Roof Drain
Ejector/Grind
Drink Ftn
Sery Sink
Misc.
Fixtures
Use/Nature SFR / Replace gas water heater. ""debit acct
of Work
Shamp Sink
Fir/Wst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Create Date 07/23/2008
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve -
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Valuation $700.00 Plan Approval $0.00 Permit Fees $25.00 ❑ Permit Voided
Issued By
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522 W. MURDOCK AVE OSHKOSH
Parcel Id #
1603330000
Date 07/23/2008
WI 54901 -2298 Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.