Loading...
HomeMy WebLinkAbout0131526-Plumbing (laterals)CITY OF OSHKOSH No 131526 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 1510 INDIGO DR Owner ROBERT SHARPLESS Create Date 07/14/2008 Contractor BERNDT EXCAVATING Category 401 -Residential-Exterior (laterals) Plan Bathtub Shower Water Softner Wait. St. Shamp Sink Coffee Maker Whirlpool Floor Drain Local Waste Ice Chest Flr/Wst Sink Int Grease Trap Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve Res. Sink Dishwasher Beer Tap Hand Sink Urinal _ Eye Wash Statn Bar Sink Sump Pump Lab Sink _ Plaster Sink Standp Rec Wtr Sewer Mtrs Water Heater Classrm Sink Sterilizers Surgeons Sink Ice Maker Deduct Meters Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature of Work to ranure. Sanitary Sewer Storm Sewer Water Service 1" Valuation $2,000.00 Plan Approval Issued By Material Plastic Permit Fees Lateral Conn. Type 1 Relay Parcel Id # 1307310100 $50.00 ^ Permit Voided Date 07/14/2008 In the pertormance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the eagsement holder(() ~ nd to secure~nv ~ ss~, ~~ppr~ is before starti0g such activity. ~ , l ~2~._Xf , Y ~ ry Si nature s_,.' ~.4 I ~`' -._°"~ Date ~ '~I ~-~ ~' -y-,~ Address 2527 W WAUKAU AVE OSHKOSH WI 54904 - 8986 Telephone Number 235-3331 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.