HomeMy WebLinkAbout0131526-Plumbing (laterals)CITY OF OSHKOSH No 131526
OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 1510 INDIGO DR Owner ROBERT SHARPLESS Create Date 07/14/2008
Contractor BERNDT EXCAVATING Category 401 -Residential-Exterior (laterals) Plan
Bathtub Shower Water Softner Wait. St. Shamp Sink Coffee Maker
Whirlpool Floor Drain Local Waste Ice Chest Flr/Wst Sink Int Grease Trap
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve
Res. Sink Dishwasher Beer Tap Hand Sink Urinal _ Eye Wash Statn
Bar Sink Sump Pump Lab Sink _ Plaster Sink Standp Rec Wtr Sewer Mtrs
Water Heater Classrm Sink Sterilizers Surgeons Sink Ice Maker Deduct Meters
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
Use/Nature
of Work
to ranure.
Sanitary Sewer
Storm Sewer
Water Service 1"
Valuation $2,000.00 Plan Approval
Issued By
Material
Plastic
Permit Fees
Lateral
Conn. Type
1 Relay
Parcel Id #
1307310100
$50.00 ^ Permit Voided
Date 07/14/2008
In the pertormance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
eagsement holder(() ~ nd to secure~nv ~ ss~, ~~ppr~ is before starti0g such activity. ~ , l
~2~._Xf , Y ~ ry
Si nature s_,.' ~.4 I ~`' -._°"~ Date ~ '~I ~-~ ~'
-y-,~
Address 2527 W WAUKAU AVE OSHKOSH WI 54904 - 8986 Telephone Number 235-3331
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.