HomeMy WebLinkAbout0131495-Plumbing (laterals)', CITY OF OSHKOSH No 131495
OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 2390 2392 WISCONSIN ST ~ Owner MARK FASEL CUSTOM BUILT HOMES LLC Create Date 07/14/2008
Contractor J & P EXCAVATING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Shower
Ftoor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Category 401 -Residential-Exterior (laterals) Plan
Water Softner
Locat Waste _
Clothes Wshr
Bidet
Beer Tap _
Lab Sink _
Sterilizer
Dip Well -
Drink Ftn
I
Wait. St.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Shamp Sink
Flr/Wst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Yalve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Valuation $5,000.00 Plan Approval ' $0.00 Permit Fees $150.00 ^ Permit Voided
Issued By Harp n~i~di~nna
In the pertomtance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature ~, Date
Address 3162 SCENIC DR
Agent/Owner
OSHKOSH
WI 54904 - 0000 Telephone Number 379-0309 (C)
~ o scneaule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.