Loading...
HomeMy WebLinkAbout0131085-Building (foundation only) ITY OF OSHKOSH No 131085 OSHKOSH ON THE WATER Job Address 1031 BAY SHORE DR Designer Contractor HARTWOOD HOMES Create Date 05/22/2008 Category 110 -New Single Family Type ~ Building ~ Sign Q Canopy [~ Fence ~ Raze Pian Zoning R1 Class of Const: Size irreg Unfinished/Basement Sq. Ft. Rooms Height Ft. ~ Projection Finished/Living Sq. Ft. Bedrooms Stories __ Canopies Garage Sq. Ft. Baths Signs Foundation ~ Poured Concrete ~ Floating Slab ~ Pier 0 Other Q Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Yes Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use/Nature of Work BUILDING PERMIT -APPLICATION AND RECORD Owner WILLIAM UBETH M LIPPERT New House /Foundation for New House with Attached Garage. HVAC Contractor Electric Contractor Fees: Valuati Issued By: Plumbing Contractor Plan Approval $0.00 Permit Fee Paid $268.00 Park Dedication $0.00 Date 06/30/2008 Final/O.P.00/00/0000 Permit Voided ~ Parcel Id # 0805930000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secur any necessary approv before starting such activity. I have read and de tan of en information. / _ Signature Date l~ ~ O Agent/Owner Address W1258 APPLELAND WAY ItAUKAUNA WI 54130 - 0000 Telephone Number 920-766-7103 To schedule inspections please call the Inspection Request line at 238-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not pertormed within two business days from the time the project is ready.