Loading...
HomeMy WebLinkAbout0130762-Building (repair foundation)CITY OF OSHKOSH No 130762 OSHKOSH ON THE WATER Job Address 432 W 8TH AVE BUILDING PERMIT -APPLICATION AND RECORD Create Date 06/20/2008 Designer Category 141 -Exterior Re Plan Type ~ Building ~ Sign ~ Canopy ~ Fence ~ Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. ^ Projection Finished/Living Sq. Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation ~ Poured Concrete ~ Floating Slab ~ Pier ~ Other Concrete Block [~ Post ~ Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature of Work FR/ Repair Foundation* 3 walls stabilizing 2 walls and excavating one of the walls. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $16,000.00 Plan Approval $0.00 Permit Fee Paid $124.00 Park Dedication $0.00 Issued By: ~~ ~. Date 06/20/2008 Final/O.P. 00/00/0000 ^ Permit Voided ~ Parcel Id # 0905810200 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any n ry approvals before starting such activity. I have read and derstand t re entioned information. Signature ~ Date ~ ~~ Address (/~d4 W AIRPORT RD Owner PHIL I FLEISCHMAN Contractor SURE-DRY-BASEMENT SYSTEMS INC Agent/Owner MENASHA WI 54952 - 1409 Telephone Number 920-967-9655 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number, Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may Continue if the inspection is not pertormed within two business days from the time the project is ready.