Loading...
HomeMy WebLinkAbout08-216JUNE 24, 2008 08 -216 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE AND SUBMIT COMPLIANCE MAINTENANCE ANNUAL REPORT INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the 2007 Compliance Maintenance Annual Report, having been reviewed, is approved, and the proper City officials are authorized and directed to submit the Report to the Department of Natural Resources. Facility Name: Oshkosh Wastewater Treatment Plant Last Updated: Reporting Year: 2007 5/14/2008 Questions InFluent No.701 Influent X Influent X Monthly Monthly Average Average Flow, MGD (C)BOD Concentrati on mg.I 8.34 Influent Monthly Average(C) BOD Loading, pounds /day ,11 e COMPLIANCE MAINTENANCE ANNUAL REPORT Influent Flow and Loading (Continued) Number of times the flow and (C)BOD exceeded 90% or 100% of design, points earned, and score: Was the influent flow meter calibrated in the last ear? • Yes Enter last calibration date, MM /DD/YYYY 12/26/2007 - O No - explain BMW IMSewer Use Ordinance 5.1 Did your community have a sewer use ordinance that limited or prohibited the discharge of excessive conventional pollutants ((C)BOD, SS, or pH) or toxic substances to the sewer from industries, commercial users, hauled waste, or residences? • Yes O No If No, please describe: Page 2 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Influent Flow and Loading (Continued) Page 3 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Effluent Quality and Plant Performance ((C)BOD) Questions Monthly average effluent values, exceedances, and points for (C)BOD. 111f any violations occurred, what action was taken to regain compliance? as the effluent flow meter calibrated in the last ear? • Yes - enter last calibration date, MO /DAY/YEAR: 10/31/2007 O No - explain: Page 4 of 28 NOTE: For systems that discharge intermittently to waters of the state, the points per monthly exceedance for this section shall be based upon a multiplication factor of 12 months divided by the number of months of discharge. Example: For a wastewater facility discharging only 6 months of the year, the multiplication factor is 12/6 = 2.0 COMPLIANCE MAINTENANCE ANNUAL REPORT Effluent Qualitv and Plant Performance ((C)BOD) (Continued) Page 5 of 28 What problems, if any, were experienced over the last year that threatened treatment? Other Monitoring and Limits 5.1 At any time in the past year was there an exceedance of a permit limit for any other pollutants suchas metals, pH, residual chlorine, or fecal coliform? O Yes • No If Yes, please describe: 5.2At any time in the past year was there an effluent acute or chronic whole effluent toxicity (WET) test? 0 Yes O No If Yes, please describe: Both tests performed 11/5/07. Both passed. 5.31f the biomonitoring (WET) test did not pass, were steps taken to identify and/or reduce source(s) of toxicity? O Yes O No • NA Please explain unless not applicable: Page 5 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Effluent Quality and Plant Performance (Total Suspended Solids) NOTE: For systems that discharge intermittently to waters of the state, the points per monthly exceedance for this section shall be based upon a multiplication factor of 12 months divided by the number of months of discharge. Example: For a wastewater facility discharging only 6 months of the year, the multiplication factor is 12/6 = 2.0 F any violations occurred, what action was taken to reqain compliance? Page 6 of 28 Vlonthlv averaae effluent values, exceedances, and points for TSS: COMPLIANCE MAINTENANCE ANNUAL REPORT Effluent Quality and Plant Performance (Ammonia = NH3) Questions �_ Monthly and weekiv averaae effluent values. exceedances, and points for NH3: Note: Limit exceedances are considered for monthly OR weekly averages but not both. When a monthly average limit exists it will be used to detect exceedances and generate points. This will be true even if a weekly limit also exists. When a weekly average limit exists and a monthly limit does not exist, the weekly limit will be used to detect exceedances and generate points. Page 7 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Effluent Quality and Plant Performance (Ammonia = NH3) (Continued) If any violations occurred, what action was taken to regain compliance? Page 8 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Effluent Quality and Plant Performance (Phosphorus) Questions Monthl average effluent values, exceedances, and points for Phosphorus NOTE: For systems that discharge intermittently to waters of the state, the points per monthly exceedance for this section shall be based upon a multiplication factor of 12 months divided by the number of months of discharge. Example: For a wastewater facility discharging only 6 months of the year, the multiplication factor is 12/6 = 2.0 f any violations occurred, what action was taken to regain compliance? Page 9 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Biosolids Qualitv and Manaaement Questions Points Biosolids Use/Disposal: 1.1 How did you use or dispose of your biosolids ?(Check all that apply) ® Land Applied Under Your Permit ❑ Publicly Distributed Exceptional Quality Biosolids ❑ Hauled to Another Permitted Facility ❑ Landfilled ❑ Incinerated ❑ Other NOTE:If you do not remove biosolids from your system annually, please describe your system type such as lagoons, reed beds, recirculating sand filters, etc, and if biosolids were land applied last year, please also check top box above. 1.1.1 If you checked Other, Please describe: Land Application Site: Last Year's Approved and Active Land Application Sites 2. 1.1 How many acres did you have? 2.1.2 How many acres did you use? 535 acres 535 acres 2.2 If you did not have enough acres for your land application needs, what action was taken? 2.3 Did you overapply nitrogen on any of your approved land application sites you used Iasi 0 year? Yes(30 points) • No 2.4 Have all the sites you used last year for land application been soil tested in the previous 0 4 years? Yes O No (10 points) O N/A Biosolids Metals Number of biosolids outfalls in your WPDES permit = 1 3.1 For each outfall tested, verify the biosolids metal quality values for your facility during the last calendar year BIOSOLIDS METALS CHARACTERISTICS utfall:002 - Cake sludge Page 10 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT biosolids Uuallty and Management (uontlnuea) Parameter 80% of H.Q. Ceiling mg /kg on a dry weight basis 1 -2 10 Points O > 2 Times Exceeded Limit Limit Limit Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High Ceiling Quality arsenic 41 75 11 8.8 8.2 7.5 9.9 10 i 0 0 cadmium 39 85 1.2 1.1 .89 1.2 .87 .94 0 0 copper 1 17 1500 4300 730 650 640 570 770 740 0 lead 300 840 <5.3 32 33 43 51 50 0 0 mercury 157 <.035 .24 .18 .37 .33 <.033 0 0 molybdenum 60 75 9.3 7.7 1640 7.5 7 11 8.5 0 0 nickel 336 420 29 25 27 22 29 24 0 0 selenium 80 100 5.3 4.3 6.7 4.2 5 6.1 0 0 zinc 2800 7500 27.3 630 540 710 700 0 0 3.1.1 Number of times any of the metals exceeded the high quality limits OR 80% of the limit for I0 molybdenum, nickel or selenium = 0 Exceedance Points 0 0 0 Points O 1 -2 10 Points O > 2 15 Points 3.1.2 If you exceeded the high quality limits, did you cumulatively track the metals loadings at each 0 land applicat site (check applicable box) O Yes O No (10 points) • NA. Did not exceed limits or no HQ limit applies (0 points) O NA. Did not land apply biosolids until limit was met(0 points) 3.1.3 Number of times any of the metals exceeded the ceiling limits = 0 Exceedance Points 0 0 0 Points O 1 10 Points O > 1 15 Points 3.1.4 Were biosolids land applied which exceeded Yes(20 points) 0 No (0 points) ceiling limit? U 3.1.5 If any metal limit (high quality or ceiling ) was Has the source of the metals been identified? any time, what action was taken? Page 11 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Biosolids Quality and Management (Continued) Outfall Number: 002 Pathogen Control(per outfall): B Bacteria Type and Limit Sample Dates: 01/01/2007 - 02/28/2007 Density: Sample Concentratinor Amount: Process: ANAER Process Description: HYDRAULIC DETENTION TIME GREATER THAN 15 DAYS AT 35 DEGREES CENTIGRADE. Outfall Number: 002 Biosolids Class: B Bacteria Type and Limit Sample Dates: 01/01/2007 - 02/28/2007 Density: Sample Concentratinor Amount: Process: ANAER Process Description: HYDRAULIC DETENTION TIME GREATER THAN 15 DAYS AT 35 DEGREES CENTIGRADE. Outfall Number: 002 Biosolids Class: B Bacteria Type and Limit Sample Dates: 03/01/2007 - 04/30/2007 Density: Sample Concentratinor Amount: Process: ANAER Process Description: HYDRAULIC DETENTION TIME GREATER THAN 15 DAYS AT 35 DEGREES CENTIGRADE. Outfall Number: 002 Biosolids Class: B Bacteria Type and Limit Sample Dates: 05/01/2007 - 06/30/2007 Density: Sample Concentratinor Amount: Process: ANAER Process Description: HYDRAULIC DETENTION TIME GREATER THAN 15 DAYS AT 35 DEGREES CENTIGRADE. Page 12 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Biosolids Quality and Management (Continued) Outfall Number: 002 Biosolids Class: B Bacteria Type and Limit Sample Dates: 07/01/2007 - 08/31/2007 Density: Sample Concentratinor Amount: Process: ANAER Process Description: HYDRAULIC DETENTION TIME GREATER THAN 15 DAYS AT 35 DEGREES CENTIGRADE. Outfall Number: 002 Biosolids Class: B Bacteria Type and Limit Sample Dates: 09101/2007 - 10/31/2007 Density: Sample Concentratinor Amount: Process: ANAER Process Description: HYDRAULIC DETENTION TIME GREATER THAN 15 DAYS AT 35 DEGREES CENTIGRADE Outfall Number: 002 Biosolids Class: B Bacteria Type and Limit Sample Dates: 11/01/2007 - 12/31/2007 Density: Sample Concentratinor Amount: Process: ANAER Process Description: HYDRAULIC DETENTION TIME GREATER THAN 15 DAYS AT 35 DEGREES CENTIGRADE 4.1 If exceeded Class B limit or did not meet the process criteria at the time of land application(40 Points) 4.1.1 Was the limit exceeded or the process criteria not met at any time? O Yes Page 13 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT t3iosoiias uuauty and Management (contmuea) I • No If yes, what action was taken? Vector Attraction Reduction(per outfall):0 Outfall Number: 002 Method Date: 02/07/2007 Option Used To Satisfy Requirement: VSR Limit (if applicable): 38 Results (if applicable): 166.1 Outfall Number: 002 Method Date: 02/07/2007 Option Used To Satisfy Requirement: VSR Limit (if applicable): 38 Results (if applicable): 166.1 Outfall Number: 002 Method Date: 04/04/2007 Option Used To Satisfy Requirement: VSR Limit (if applicable): 38 Results (if applicable): 160.8 Outfall Number: 002 Method Date: 04/04/2007 Option Used To Satisfy Requirement: VSR Limit (if applicable): 38 Results (if applicable): 160.8 Outfall Number: 002 Method Date: 06/06/2007 Option Used To Satisfy Requirement: VSR Limit (if applicable): 38 Results (if applicable): 55.7 Page 14 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Biosolids Quality and Management (Continued) Outfall Number: 002 Method Date: Outfall Number: 002 VSR Method Date: 06/06/2007 Results (if applicable): Option Used To Satisfy Requirement: VSR Limit (if applicable): 38 Results (if applicable): 155.7 Outfall Number: 002 Method Date: 08/08/2007 Option Used To Satisfy Requirement: VSR Limit (if applicable): 38 Results (if applicable): Outfall Number: 002 Method Date: 08/08/2007 Option Used To Satisfy Requirement: VSR Limit (if applicable): 38 Results (if applicable): 49.9 Outfall Number: 002 Method Date: 08/08/2007 Option Used To Satisfy Requirement: VSR Limit (if applicable): 38 Results (if applicable): 49.9 Outfall Number: 002 Method Date: 10103/2007 Option Used To Satisfy Requirement: VSR Limit (if applicable): 38 Results (if applicable): 50.3 Outfall Number: 002 Method Date: 10103/2007 Option Used To Satisfy Requirement: VSR Limit (if applicable): 38 Results (if applicable): 50.3 Outfall Number: 002 Method Date: 12/05/2007 Option Used To Satisfy Requirement: VSR Limit (if applicable): 38 Results (if applicable): 60.7 Page 15 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Biosolids Quality and Management (Continued) Outfall Number: 002 Method Date: 12/05/2007 Option Used To Satisfy Requirement: VSR Limit (if applicable): 38 Results (if applicable): 160.7 5.1 If the limit or criteria was exceeded at the time of land application, 40 point 0 5.1.1 Was the limit exceeded or the process criteria not met at any time? Yes • No If yes, what action was taken? Biosolids Storage:0 6.1 How many days of actual,current biosolids storage capacity did your wastewater treatment 0 facility have either on -site or off -site? • >+ 180 days (0 points) O 150 - 179 days (10 points) O 120 - 149 days (20 points) O 90 - 119 days (30 points) O < 90 days (40 points) O Not Applicable (0 points) 6.2 If you check Not Applicable above, explain why. Issues: 7.1 Describe any outstanding biosolids issues with treatment, use or overall mgt? Page 16 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Staffing and Preventative Maintenance (All Treatment Plants) Questions Points g ; =Was wastewater treatment plant adequately staffed last year? • Yes O No If No, please describe: Could use more help /staff for: Did your wastewater staff have adequate time to properly operate and maintain the plant and fulfill all wastewater management tasks including recordkeeping? • Yes O No. Explain Did your plant have a documented AND implemented plan for preventative maintenance on major 0 equipment items? • Yes (Continue with questions below) O No (40 points and go to question 6) If No, explain: Did this preventative maintenance program depict frequency of intervals, types of lubrication, and 0 other tasks necessary for each piece of equipment? • Yes O No (10 points) Were these preventative maintenance tasks, as well as major equipment repairs, recorded and 0 filed so future maintenance problems can be assessed properly? • Yes O (Paper file system) O (Computer program) • (Both Paper and Computer) O No (10 points) Its Did your plant have a detailed O &M Manual that was used as a reference when needed? • Yes O No Rate the overall maintenance of your wastewater plant. • Excellent Page 17 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Staffing and Preventative Maintenance (All Treatment Plants) (Continued) O Very Good O Good O Fair O Poor Describe your rating: Facility staff are proactive with both maintenance and equipment replacement. Page 18 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Operator Certification and Education Points Questions Did you have a designated operator -in- charge during the report year? 0 • Yes (0 point) O No (20 points) Name: KEVIN R SORGE Certification No: 33081 In accordance with Chapter NR 114.08 and 114.09, Wisconsin Administrative Code, what grade and subclass(es) were required for the operator -in- charge to operate the wastewater treatment plant and what grade and subclass(es) were held by the operator -in- charge? Required: 4 - ACEFGIJ; A - PRIMARY SETTLING; C - ACTIVATED SLUDGE; E - DISINFECTION; F - ANAEROBIC DIGESTION; G - MECHANICAL SLUDGE; I - PHOSPHORUS REMOVAL; J - LABORATORY Held: 4 - ACEFGIJ; 4 - A= PRIMARY SETTLING GRADE 4; C= ACTIVATED SLUDGE GRADE 4; E= DISINFECTION GRADE 4; F= ANAEROBIC DIGESTION GRADE 4; G= MECHANICAL SLUDGE GRADE 4; 1= PHOSPHORUS REMOVAL GRADE 4; J= LABORATORY GRADE 4 Was the operator -in- charge certified at the appropriate level to operate this plant? 0 • Yes (0 point) O No (20 points) In the event of the loss of your designated operator -in- charge, did you have a contingency plan to 0 ensure the continued proper operation & maintenance of the plant that includes one or more of the following options (check all that apply): 4.1 ® one or more additional certified operators on staff 4.2 ❑ an arrangement with another certified operator 4.3 ❑ an arrangement with another community with a certified operator 4.4 ❑ an operator on staff who has an operator -in- training certificate for your plant and is expected be certified within one year 4.5 ❑ a consultant to serve as your certified operator 4.6 ❑ None of the above (20 points) Explain: The Wastewater Superintendent, Utilities Superintendent, And two other Liquids operators all hold the necessary certifications. Page 19 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Operator Certification and Education (Continued) M m If you had a designated operator -in- charge, was the operator -in- charge earning continuing education credits at the following rates? Grades T, 1, and 2: • Averaging 6 or more CEUs per year O Averaging less than 6 CEOs per year Grades 3 and 4: • Averaging 8 or more CEUs per year O Averaging less than 8 CEUs per year Not applicable: O See Question 1. Page 20 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Finnnrinl Mannnement Questions Points Person Providing This Financial Information Name: Jeremy Maurer Telephone: (920) 232 -5321 E -Mail Address(optional): jmaurer @ci.oshkosh.wi.us Are User Charge or other Revenues sufficient to cover O &M Expenses for your wastewater 0 treatment plant AND /OR collection system? • Yes (0 points) O No (40 points) If No, please explain: When was the User Charge System or other revenue source(s) last reviewed and /or revised? 0 Year: 2007 • 0 -2 years ago (0 points) O 3 or more years ago (20 points) O Not Applicable (Private Facility) Did you have a special account (e.g., CWFP required segregated Replacement Fund, etc.) or 0 financial resources available for repairing or replacing equipment for your wastewater treatment plant and /or collection system? • Yes O No (40 points) REPLACEMENT FUNDS(PUBLIC MUNICIPAL FACILITIES SHALL COMPLETE QUESTION 5) all Equipment Replacement Funds 5.1 When was the Equipment Replacement Fund last reviewed and /or revised? 0 Year: 2007 • 1 -2 years ago (0 points) O 3 or more years ago (20 points) O Not Applicable Explain: 5.2 What amount is in your Replacement Fund? Equipment Replacement Fund Activity 5.2.1 Ending Balance Reported on Last Year's CMAR: $3,534,919.38 5.2.2 Adjustments - $0.40 if necessary (e.g., earned interest, audit correction, withdrawal of excess funds, increase making up previous shortfall, etc.) 5.2.3 Adjusted January 1st Beginning Balance $3,534,918.98 Page 21 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Financia Management (Continued) 5.2.4 Additions to Fund (e.g., portion of User Fee, earned interest, etc.) + $502,788.57 5.2.5 Subtractions from Fund (e.g., equipment replacement, major repairs - $222,224.64 - use description box 5.2.5.1 below *.) 5.2.6 Ending Balance as of December 31st for CMAR Reporting Year $3,815,482.91 (All Sources: This ending balance should include all Equipment Replacement Funds whether held in a bank account(s), certificate(s) of deposit, etc.) *5.2.5.1. Indicate adjustments, equipment purchases and/or major repairs from 5.2.5 above Snell, Murdock,and North Lift Stations 5.3 What amount should be in your replacement fund? $3,749,815.36 (If you had a CWFP loan, this amount was originally based on the Financial Assistance Agreemen (FAA) and should be regularly updated as needed. Further calculation instructions and an example can be found by clicking the HELP option button.) 5.3.1 Is the Dec. 31 Ending Balance in your Replacement Fund above ( #5.2.6) equal to or greater than the amount that should be in it( #5.3)? • Yes O No Explain: Future Planning 6.1 During the next ten years, will you be involved in formal planning for upgrading, rehabilitating or new construction of your treatment facility or collection system? • Yes (If yes, please provide major project information, if not already listed below) O No Project Description Estimated Cost Approximate Construction Year Additional Aeration Basin $2,700,000.00 2014 2 Final Clarifiers $2,600,000.001 2014 I Financial Management General Comments: Page 22 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Sanitary Sewer Collection Systems Do you have a Capacity, Management, Operation & Maintenance(CMOM) requirement in your WPDES permit? O Yes. • No Did you have a documented (written records /files, computer files, video tapes, etc.) sanitary sewer I0 collection system operation & maintenance or CMOM program last calendar year? • Yes (go to question 3) O No (30 points) (ao to auestion 4 Check the elements listed below that are included in your Operation and Maintenance (O &M) or CMOM program.: ® Goals: specific identification of major goals of your O &M /CMOM program such a: 1/1 reduction, basement backup and SSO reductions, repair and rehabilitation of sewers, system cleaning and monitoring, etc. ® Organization: identification of those managers and persons who are responsible for implementing your O &M /CMOM program and reporting sanitary sewer overflows ® Legal Authority: sufficient authority, through sewer use ordinances, service agreements or other legally binding documents to control infiltration /inflow sources, proper design, construction, inspection and testing of new and rehabilitated sewers and laterals and address flows from satellite collection systems, if present. ® Maintenance Activities: routine preventative O &M activities, including adequate maintenance of facilities and equipment. By the use of: sewer system monitoring; inspections; a system to identify infiltration /inflow sources (including private property); a system for replacement part inventories; control of fat, oil & grease; employee training program; and a management system for the collection and use of information to establish O &M priorities ® Design and Performance Standards: establish requirements and standards for design, installation and inspection of new sewers, service laterals, pump stations and sewer rehabilitation projects. ® Overflow Emergency Response Plan: documented procedures for responding to SSOs, power outages, lift station failures sewer blockages or any other similar events of an emergency nature. ❑ Capacity Assurance: a program to assess the current capacity of the collection system to identify problems or bottlenecks ; and if required, a System Evaluation and Capacity Assurance Plan (SECAP). ❑ Annual Self- Auditing of your O &M /CMOM Program to ensure above components are being implemented, evaluated, and re- prioritized as needed. ® Special Studies (if applicable): any special studies undertaken such as 1/1 Analysis, Sewer System Evaluation Surveys (SSES), I or sewer pipe studies. Please list the study reports of the last year below: New York Ave and Hazel Street Interceptor Study Page 23 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Sanitary Sewer Collection Systems (Continued) Page 24 of 28 Did your sanitary sewer collection system maintenance program include the following maintenance activities? Complete all that apply and indicate the amount maintained: Cleaning 20 /o of system /year Root Removal 2.36 /o of system /year Flow Monitoring � /o of system /year Smoke Testing � /o of system /year Sewer Line Televising = I. of system /year Manhole Inspections ED of system /year Lift Station O &M 104 per L.S /year Manhole Rehabilitation 1.8 /o of manholes rehabed Mainline Rehabilitation .69 /o of sewer lines rehabed Private Sewer Inspections 1.01 /o of system /year Private Sewer 1/1 Removal 1 Al /o of private services Please include additional comments about your sanitary sewer collection system below: Provide the following collection system and flow information for the past year: 0 28.12 Total Actual Amount of Precipitation Last Year 31.57 Annual Average Precipitation (for your location) 268 Miles of Sanitary Sewer Page 24 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Sanitary Sewer Collection Systems (Continued) Page 25 of 28 17 Number of Lift Stations 10 of Lift Station Failure 1 Number of Sewer Pipe Failures 00 Number of Sanitary Sewer OverFlow (SSO) Occurrences:(10 points per occurrence) 19 Number of Basement Backup Occurrences 59 Number of Complaints 10.250 Average Daily Flow in MGD 13.69 Peak Monthly Flow in MGD(if available) Peak Hourly Flow in MGD(if available) PERFORMANCE INDICATORS 0.00 Lift Station Failures(failures /ps /year) 0.00 Sewer Pipe Failures(pipe failures /sewer mile /yr) 0.00 Sanitary Sewer Overflows (number /sewer mile /yr) 0.07 Basement Backups(number /sewer mile) 0.22 Complaints (number /sewer mile) 1.3 Peaking Factor Ratio (Peak Monthly:Annual Daily Average) 0.0 Peaking Factor Ratio(Peak Hourly:Annual daily Average) Was infiltration /inflow(1 /1) significant in your community last year? O Yes • No If Yes, please describe: Page 25 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Sanitary Sewer Collection Systems (Continued) I Has in and resultant high flows affected performance or created problems in your collection system, lift stations, or treatment plant at any time in the past year? O Yes • No If Yes, please describe: Explain any infiltration /inflow(1 /1) changes this year from previous years? What is being done to address infiltration /inflow in your collection system? Televising, Manhole inspections, cleaning, repairs, and replacements. Page 26 of 28 COMPLIANCE MAINTENANCE ANNUAL REPORT Facility Name: Oshkosh Wastewater Treatment Plant Last Updated: Reporting Year: 2007 WPDES No.0025038 Notes: A = Voluntary Range B = Voluntary Range C = Recommendation Range (Response Required) D = Action Range (Response Required) F = Action Range (Response Required) COMPLIANCE MAINTENANCE ANNUAL REPORT Facility Name: Oshkosh Wastewater Treatment Plant Last Updated: Reporting Year: 2007 Resolution or Owner's Statement