HomeMy WebLinkAbout0130673-Building (egress window)it
CITY OF OSHKOSH
No 130673
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 1215 PHEASANT CREEK DR ' Owner CHARLOTTE A HARTMAN
Designer ' Contractor CUSTOM BUILT HOMES
Category 141 -Exterior Remodeling
Plan
Type ~ Building ~ Sign ' ~ Canopy (~ Fence Q Raze
Zoning ', Class of Const: Size
Unfinished/Basement Sq. Ft. Rooms
Finished/Living Sq. Ft. Bedrooms
Garage Sq. Ft. Baths
Foundation ~ Poured Concrete ~ Floating Slab Q Pier
Q Concrete Block ~ Post ~ Treated Wood
Create Date 06/18/2008
Height Ft. ~ Projection
Stories Canopies
Signs
Q Other
Occupancy Permit Occupancy Fee ' $0.00 Flood Plain
Park Dedication # Dwelling Units 0
Use/Nature
of Work
Height Permit
# Structures 0
FR/ Egress window' Installing an egress window for the lower level of the house.
HVAC Contractor
Electric Contractor
Fees: Valuation $2,000.00 Plan Approval
Issued By: ~~
Plumbing Contractor
$0.00 Permit Fee Paid $32.00 Park Dedication $0.00
Date 06/18/2008 Final/O.P.00/00/0000
', [] Permit Voided ~ Parcel Id # 1342504000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
I have read and unders(ar~d a afore 'oned information.
Signature ,~ ~ : '/~/ ~.~ ~O~
Date
Address 2274 WILLOW WAY DR OSHKOSH WI 54904 - 7771 Telephone Number 426-1556
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.