Loading...
HomeMy WebLinkAbout0130673-Building (egress window)it CITY OF OSHKOSH No 130673 OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 1215 PHEASANT CREEK DR ' Owner CHARLOTTE A HARTMAN Designer ' Contractor CUSTOM BUILT HOMES Category 141 -Exterior Remodeling Plan Type ~ Building ~ Sign ' ~ Canopy (~ Fence Q Raze Zoning ', Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Finished/Living Sq. Ft. Bedrooms Garage Sq. Ft. Baths Foundation ~ Poured Concrete ~ Floating Slab Q Pier Q Concrete Block ~ Post ~ Treated Wood Create Date 06/18/2008 Height Ft. ~ Projection Stories Canopies Signs Q Other Occupancy Permit Occupancy Fee ' $0.00 Flood Plain Park Dedication # Dwelling Units 0 Use/Nature of Work Height Permit # Structures 0 FR/ Egress window' Installing an egress window for the lower level of the house. HVAC Contractor Electric Contractor Fees: Valuation $2,000.00 Plan Approval Issued By: ~~ Plumbing Contractor $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Date 06/18/2008 Final/O.P.00/00/0000 ', [] Permit Voided ~ Parcel Id # 1342504000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. I have read and unders(ar~d a afore 'oned information. Signature ,~ ~ : '/~/ ~.~ ~O~ Date Address 2274 WILLOW WAY DR OSHKOSH WI 54904 - 7771 Telephone Number 426-1556 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.