June 17, 2008
Paul Sobieck
Temperature Systems Inc.
2200 South Ashland Ave
Green Bay, WI 54304
Tom Donovan
1025 West Ss' Ave.
Oshkosh, WI 54902
Site:
St Jude /Sacred Heart Church
1025 West Ss' Ave
Oshkosh WI 54902
For:
Description: New A/C system
Object Type: HVAC only
Occupancy: A: Assembly
Plan Number: D2-2393-0508
City of Oshkosh
Division of Inspection Services
215 Church Avenue
PO Box 1130
Oshkosh WI 54903-1130
www.ci.oshkosh.wi.us
The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes and
Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defined in Chapter
101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements
Key Item(s) /Conditions:
IMC 302.1 The building or structure shall not be weakened by the installation of mechanical systems.
Verify that existing structure is capable of supporting the additional weight of the proposed roof top
equipment.
IMC 304.9 Guards. Guards shall be provided where appliances, equipment, fans or other components that
require service are located within 10 feet (3048 mm) of a roof edge or open side of a walking surface and
such edge or open side is located more than 30 inches (762 mm) above the floor, roof or grade below. The
guard shall extend not less than 30 inches (762 mm) beyond each end of such appliance, equipment, fan or
component and the top of the guard shall be located not less than 42 inches (1067 mm) above the elevated
surface adjacent to the guard. The guard shall be constructed so as to prevent the passage of a 21-inch-
diameter (533 mm) sphere and shall comply with the loading requirements for guards specified in the
International Building Code. Provide detailed information showing compliance with this section.
IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment and
appliances requiring access are installed on roofs or elevated structures at a height exceeding 16 feet (4877
mm), such access shall be provided by a permanent approved means of access, the extent of which shall be
from grade or floor level to the equipment and appliances' level service space. Such access shall not
require climbing over obstructions greater than 30 inches (762 mm) high or walking on roofs having a
slope greater than 4 units vertical in 12 units horizontal (33-percent slope).
I:.tnspeciioais`~l'tan Rec•iec~%,Co~~finer~ial Ffaa~ Re~•iev.~ "W~08'.L)? ?3t??-(15pS iU25 T$' tf~ A~~r; 1'111~C On}y.dGC
Page 1 of 2
• NEC 110.26 Spaces About Electrical Equipment. Sufficient access and working space shall be
provided and maintained about all electric equipment to permit ready and safe operation and maintenance
of such equipment. Verify that the appropriate clearances required by this section are being maintained
• Comm 61.31(4) Revisions to approved plans. All proposed revisions and modifications which involve
rules under this code and which are made to construction documents that have previously been granted
approval by the department or its authorized representative, shall be submitted to the office that granted the
approval. All revisions and modifications to plans shall be approved in writing by the department or its
authorized representative prior to the work involved in the revision or modification being carried out. A
revision or modification to a plan, drawing or specification shall be signed and sealed in accordance with
Comm 61.31(1).
• MUN 30-35 (I)(5) All roof top and ground level mechanical equipment and utilities shall be screened as
required by the planning department. Contact Darryn Burich -Director of Planning Services (920) 236-
5055 for additional information on screening requirements. Prior to permit issuance approval is required
from the planning department
SUBMIT:
• IMC 403.3.4 Balancing. Ventilation systems shall be balanced by an approved method. Such
balancing shall verify that the ventilation system is capable of supplying the airflow rates required by
Section 403. Balancing report required to be submitted prior to final occupancy being allowed
~ Comm 61.40 (4) Supervision. Prior to the initial occupancy of a new building or addition and prior to the
fmal occupancy of an alteration of an existing building the supervising professional shall file a compliance
statement form SBD-9720 with this office.
A copy of the approved plans, specifications, and this letter shall be on-site during construction. All permits are required to
be obtained prior to commencement of work.
In granting this approval the City of Oshkosh Inspection Services Department reserves the right to require changes or
additions should conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this
review shall relieve the designer of the responsibility for designing a safe building, structure, or component.
Inquiries concerning this correspondence may be made to me at the number listed below or the address on this letterhead.
Respec 1
rian oe
Building Systems Consultant '
(920) 236-5051 Monday- Friday 7:30 A.M. to 8:30 A.M and 12:30 A.M to 1:30 P.M.
bnoe@ci.oshkosh.wi.us ',
cc: Property file
', Fee Required $ 320.00
Fee Received $ 320.00
'~, Balance Due $ 0.00
T:`.inpettiu?tS`•.T'Ian.Reti•iea-~.C'ummeirial.P?;~~ Re~ir~l^_9b)'.~)' =^_393-(1St~$ ?02~ t~' Buz Aye. tI~~:a.C t`~nly.duc
Page 2 of 2